2.4 ON-GOING CITY OF OAKLAND PROJECTS<br />

2.4.1 Signal Interconnect Projects<br />

Signal interconnect has been or is currently being installed in various locations in<br />

<strong>Oakland</strong>. The following table summarizes these projects.<br />

Table 2.1: Signal Interconnect Projects in <strong>Oakland</strong><br />

Location <strong>of</strong> Signal Interconnect Installation<br />

San Pablo Avenue Project<br />

• between 14 th Street and Alcatraz Avenue<br />

• also connects into the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> Building<br />

at 250 Frank H. Ogawa Plaza where a TMC is<br />

planned to be located<br />

The North CBD Controller and Hegenberger<br />

Road/73 rd Avenue and Signal Interconnect<br />

Upgrade Project<br />

• along West Grand Avenue and Grand Avenue,<br />

between San Pablo Avenue and Harrison<br />

Street, along Broadway, between West Grand<br />

Avenue and 20 th Street<br />

• along Hegenberger Road/73 rd Avenue between<br />

Pardee Drive and Office Complex Driveway<br />

Broadway Transit Priority Project<br />

• along Broadway from 3 rd Street to 20 th Street,<br />

and along 20 th Street between Broadway and<br />

Telegraph Avenue<br />

42 nd Avenue/High Street Access Improvement<br />

Project<br />

• three intersections on High Street and three<br />

intersections on 42 nd Avenue near I-880<br />

Hegenberger Gateway Project<br />

• along Hegenberger Road between Doolittle<br />

Drive and Edgewater Drive<br />

Port <strong>of</strong> <strong>Oakland</strong>’s 98 th Avenue Project<br />

• from Doolittle to I-880 along 98 th Avenue<br />

Fruitvale BART Transit Village Project<br />

• from E. 12 th Street to San Leandro Street and<br />

on San Leandro Street from Fruitvale Avenue<br />

to 37 th Avenue<br />

Description<br />

• Signal controllers and cabinets were replaced<br />

as part <strong>of</strong> this project.<br />

• The North CBD interconnect ties into the San<br />

Pablo interconnect, which ties into the planned<br />

TMC. Sixteen Type 170E controllers, ten Type<br />

336 cabinets and six Type 332 cabinets were<br />

installed in this North CBD area. Construction<br />

<strong>of</strong> this project has just been completed.<br />

• The <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> installed six new Model<br />

170 controllers and Type 332 cabinets on<br />

Hegenberger Road. Construction <strong>of</strong> this<br />

project has just been completed.<br />

• Provides for future tie-in to the planned TMC.<br />

• 16 Model 170 controller assemblies with Model<br />

332 cabinets will be installed.<br />

• EVP devices will also be installed for transit<br />

priority.<br />

• Signals along the corridor will be retimed for<br />

the new installations.<br />

• The project design is 100 percent complete.<br />

• new signal interconnect conduit to be installed<br />

• widening <strong>of</strong> High Street and extension <strong>of</strong> 42 nd<br />

Avenue<br />

• realignment <strong>of</strong> Howard Street and Oakport<br />

Street<br />

• joint project between Port <strong>of</strong> <strong>Oakland</strong> and <strong>City</strong><br />

<strong>of</strong> <strong>Oakland</strong><br />

• installed a 2-inch signal interconnect conduit<br />

with twisted wire pairs along Hegenberger<br />

• the signal interconnect cable (SIC) has not yet<br />

been terminated in the controller cabinets<br />

• traffic signals are not yet coordinated<br />

• included design <strong>of</strong> additional conduit for fiber<br />

but because <strong>of</strong> budget limitations this work was<br />

not selected for construction<br />

• three Model 170 controllers and interconnect<br />

conduit were installed<br />

• In addition, 98 th Avenue has recently been<br />

widened to six lanes and it now crosses under<br />

Doolitle Drive reducing the number <strong>of</strong> traffic<br />

signals on 98 th Avenue<br />

• Fiber optic signal interconnect was installed<br />

• Five Type 170E Controllers with Model 332<br />

Cabinets were installed.<br />

<strong>City</strong> <strong>of</strong> <strong>Oakland</strong> ITS Strategic Plan<br />

16 September, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!