2.4 ON-GOING CITY OF OAKLAND PROJECTS<br />
2.4.1 Signal Interconnect Projects<br />
Signal interconnect has been or is currently being installed in various locations in<br />
<strong>Oakland</strong>. The following table summarizes these projects.<br />
Table 2.1: Signal Interconnect Projects in <strong>Oakland</strong><br />
Location <strong>of</strong> Signal Interconnect Installation<br />
San Pablo Avenue Project<br />
• between 14 th Street and Alcatraz Avenue<br />
• also connects into the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> Building<br />
at 250 Frank H. Ogawa Plaza where a TMC is<br />
planned to be located<br />
The North CBD Controller and Hegenberger<br />
Road/73 rd Avenue and Signal Interconnect<br />
Upgrade Project<br />
• along West Grand Avenue and Grand Avenue,<br />
between San Pablo Avenue and Harrison<br />
Street, along Broadway, between West Grand<br />
Avenue and 20 th Street<br />
• along Hegenberger Road/73 rd Avenue between<br />
Pardee Drive and Office Complex Driveway<br />
Broadway Transit Priority Project<br />
• along Broadway from 3 rd Street to 20 th Street,<br />
and along 20 th Street between Broadway and<br />
Telegraph Avenue<br />
42 nd Avenue/High Street Access Improvement<br />
Project<br />
• three intersections on High Street and three<br />
intersections on 42 nd Avenue near I-880<br />
Hegenberger Gateway Project<br />
• along Hegenberger Road between Doolittle<br />
Drive and Edgewater Drive<br />
Port <strong>of</strong> <strong>Oakland</strong>’s 98 th Avenue Project<br />
• from Doolittle to I-880 along 98 th Avenue<br />
Fruitvale BART Transit Village Project<br />
• from E. 12 th Street to San Leandro Street and<br />
on San Leandro Street from Fruitvale Avenue<br />
to 37 th Avenue<br />
Description<br />
• Signal controllers and cabinets were replaced<br />
as part <strong>of</strong> this project.<br />
• The North CBD interconnect ties into the San<br />
Pablo interconnect, which ties into the planned<br />
TMC. Sixteen Type 170E controllers, ten Type<br />
336 cabinets and six Type 332 cabinets were<br />
installed in this North CBD area. Construction<br />
<strong>of</strong> this project has just been completed.<br />
• The <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> installed six new Model<br />
170 controllers and Type 332 cabinets on<br />
Hegenberger Road. Construction <strong>of</strong> this<br />
project has just been completed.<br />
• Provides for future tie-in to the planned TMC.<br />
• 16 Model 170 controller assemblies with Model<br />
332 cabinets will be installed.<br />
• EVP devices will also be installed for transit<br />
priority.<br />
• Signals along the corridor will be retimed for<br />
the new installations.<br />
• The project design is 100 percent complete.<br />
• new signal interconnect conduit to be installed<br />
• widening <strong>of</strong> High Street and extension <strong>of</strong> 42 nd<br />
Avenue<br />
• realignment <strong>of</strong> Howard Street and Oakport<br />
Street<br />
• joint project between Port <strong>of</strong> <strong>Oakland</strong> and <strong>City</strong><br />
<strong>of</strong> <strong>Oakland</strong><br />
• installed a 2-inch signal interconnect conduit<br />
with twisted wire pairs along Hegenberger<br />
• the signal interconnect cable (SIC) has not yet<br />
been terminated in the controller cabinets<br />
• traffic signals are not yet coordinated<br />
• included design <strong>of</strong> additional conduit for fiber<br />
but because <strong>of</strong> budget limitations this work was<br />
not selected for construction<br />
• three Model 170 controllers and interconnect<br />
conduit were installed<br />
• In addition, 98 th Avenue has recently been<br />
widened to six lanes and it now crosses under<br />
Doolitle Drive reducing the number <strong>of</strong> traffic<br />
signals on 98 th Avenue<br />
• Fiber optic signal interconnect was installed<br />
• Five Type 170E Controllers with Model 332<br />
Cabinets were installed.<br />