09.01.2015 Views

Intelligent Transportation Systems - City of Oakland

Intelligent Transportation Systems - City of Oakland

Intelligent Transportation Systems - City of Oakland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

73rd Ave<br />

Maritime Street<br />

7th St.<br />

Airport Dr.<br />

Hegenberger Rd.<br />

International<br />

Blvd.<br />

Foothill Blvd.<br />

San Pablo Ave.<br />

MacArthur Blvd.<br />

San Leandro St.<br />

Fruitvale Ave.<br />

High St.<br />

Broadway<br />

E. 14th St.<br />

98th Ave.<br />

Telegraph Ave.<br />

MacArthur<br />

Foothill Blvd.<br />

Bancr<strong>of</strong>t Ave.<br />

Bancr<strong>of</strong>t Ave.<br />

Interconnect remaining isolated signals<br />

to the TMC. Branch cable may be used<br />

to connect nearby signals to the<br />

communications trunk. Remote<br />

locations may need to be connected via<br />

a wireless link.<br />

EOC<br />

INT ER ST ATE<br />

CB<br />

AMF<br />

MSY<br />

AME<br />

Grand Ave.<br />

CAL<br />

TMC<br />

PAB<br />

35th Ave.<br />

Alcatraz<br />

INT ER ST ATE<br />

INT ER ST ATE<br />

N<br />

Scale 1:4300<br />

Blvd.<br />

MacArthur Blvd.<br />

August 2003 <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> ITS Strategic Plan<br />

TMC<br />

EOC<br />

PAB<br />

CAL CALTRANS TMC<br />

MSY<br />

CB<br />

CITY OF OAKLAND<br />

DOWNTOWN<br />

TRANSPORTATION<br />

MANAGEMENT CENTER (TMC)<br />

CITY OF OAKLAND<br />

EMERGENCY OPERATIONS<br />

CENTER (EOC)<br />

POLICE ADMINISTRATION<br />

BUILDING<br />

CITY OF OAKLAND<br />

MUNICIPAL SERVICE YARD<br />

COLISEUM BART STATION<br />

AME EXISTING AMTRAK STATION<br />

AMF FUTURE AMTRAK STATION<br />

TRAFFIC SIGNAL<br />

COMMUNICATIONS TRUNK<br />

(RECOMMENDED FIBER OPTIC CABLE)<br />

COMMUNICATIONS TRUNK<br />

(PREVIOUSLY COMPLETED<br />

MICROWAVE LINK)<br />

COMMUNICATIONS TRUNK<br />

(PREVIOUSLY COMPLETED FIBER<br />

OPTIC CABLE)<br />

COMMUNICATIONS TRUNK<br />

(PREVIOUSLY COMPLETED<br />

TWISTED-WIRE PAIR)<br />

LONG-TERM PROJECTS SHOULD BE<br />

CONSIDERED FOR THE CORRIDORS ABOVE.<br />

PROJECTS ARE DETAILED IN SECTION 8.3<br />

AND COVER COMMUNICATIONS, SIGNAL<br />

SYSTEMS, TRAVELER INFORMATION,<br />

TRANSIT MANAGEMENT, EMERGENCY<br />

MANAGEMENT AND INTEGRATION.<br />

LONG-TERM (10-20 YEARS) ITS AND COMMUNICATIONS INFRASTRUCTURE DEPLOYMENT BY CORRIDOR<br />

FIGURE 8.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!