- Page 1: Citywide ITS Strategic Plan Final R
- Page 5 and 6: 6.7.3 Long-Term Communications Plan
- Page 7 and 8: SECTION 1 Introduction 1.1 PURPOSE
- Page 9 and 10: The vision of the Citywide ITS Stra
- Page 11 and 12: SIC SMFO SONET SR2S STP TAT TBS TCT
- Page 13 and 14: through the thoughtful and effectiv
- Page 15 and 16: the downtown area) is time-based. D
- Page 17 and 18: Most of the controllers throughout
- Page 19 and 20: 2.3.2 Bay Area Regional ITS Archite
- Page 21 and 22: • San Pablo Avenue • Telegraph
- Page 23 and 24: 2.4.2 Other Oakland Plans The plann
- Page 25 and 26: Port of Oakland Airport Roadway Pro
- Page 27 and 28: SECTION 3 Signal System As part of
- Page 29 and 30: In the Needs Assessment workshop, s
- Page 31 and 32: Table 3.2 - High Priority Corridors
- Page 33 and 34: agencies such as AC Transit and BAR
- Page 35 and 36: In addition to selecting a signal s
- Page 37 and 38: TS-1 and TS-2 Options In addition t
- Page 39 and 40: Alternative 3: Hybrid System A thir
- Page 41 and 42: 4.1.2 Traveler Information Requirem
- Page 43 and 44: • Cameras mounted with a pan-tilt
- Page 45 and 46: These detectors can be installed in
- Page 47 and 48: • LED Hybrid - LED hybrid signs j
- Page 49 and 50: ecently completed the design of a P
- Page 51 and 52: • Full closure or four quadrant r
- Page 53 and 54:
oute information is typically disse
- Page 55 and 56:
4.3.3 Internet Access The Internet
- Page 57 and 58:
A more sophisticated approach opera
- Page 59 and 60:
EVP Recommendations - The Oakland F
- Page 61 and 62:
SECTION 5 High-Level System Archite
- Page 63 and 64:
These seven user services can be ex
- Page 65 and 66:
Figure 5.2 - High-Level Center-to-C
- Page 67 and 68:
5.4 ARCHITECTURE RECOMMENDATIONS As
- Page 69 and 70:
Architecture Version 3.0 includes 6
- Page 71 and 72:
SECTION 6 Communications Network 6.
- Page 73 and 74:
have an effect on the alternatives
- Page 75 and 76:
Figure 6.1 - Communications Topolog
- Page 77 and 78:
• Fault tolerance. If a communica
- Page 79 and 80:
Table 6.1 - Bandwidth Comparison D
- Page 81 and 82:
There are three different types of
- Page 83 and 84:
This same hardwire configuration ca
- Page 85 and 86:
August 2003 City of Oakland ITS Str
- Page 87 and 88:
August 2003 City of Oakland ITS Str
- Page 89 and 90:
August 2003 City of Oakland ITS Str
- Page 91 and 92:
surveillance purposes in the near f
- Page 93 and 94:
7.1.3 Communications Infrastructure
- Page 95 and 96:
Table 7.1 - TMC Equipment List Cont
- Page 97 and 98:
7.3.2 Equipment Room The equipment
- Page 99 and 100:
than 5’6” wide by 7’ long. Th
- Page 101 and 102:
September 2003 City of Oakland ITS
- Page 103 and 104:
o High Street o MacArthur Boulevard
- Page 105 and 106:
• The City of Oakland Fire Depart
- Page 107 and 108:
8.2 MEDIUM-TERM PROJECTS This secti
- Page 109 and 110:
• The City’s Fire Department sh
- Page 111 and 112:
8.3 LONG-TERM PROJECTS This section
- Page 113 and 114:
73rd Ave Maritime Street 7th St. Ai
- Page 115 and 116:
Table 8.2 - Medium-Term Deployment
- Page 117 and 118:
SECTION 9 Operations and Management
- Page 119 and 120:
Incident Management Systems Safety
- Page 121 and 122:
• Signal Technicians - 5.5 FTE Wi
- Page 123 and 124:
• Optical Time Domain Reflectomet
- Page 125 and 126:
diagnostic equipment, maintain an a
- Page 127 and 128:
9.7 O&M COSTS This section provides
- Page 129 and 130:
management, etc.) or the integratio
- Page 131 and 132:
Lighting Act of 1972, Part 2 of Div
- Page 133: