13.04.2015 Views

student feedback and leadership - Office for Learning and Teaching

student feedback and leadership - Office for Learning and Teaching

student feedback and leadership - Office for Learning and Teaching

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Part B: Building Leadership Capacity - SET: Mathematics & Geospatial Sciences ART Report<br />

Have you developed any resources that may be useful <strong>for</strong> others<br />

to achieve these outcomes? Describe or list or append.<br />

––<br />

We are aiming to develop a list of suggestions <strong>for</strong> improving <strong>student</strong>s<br />

teaching, learning, assessment <strong>and</strong> <strong>feedback</strong> practices through our<br />

LTIF grant.<br />

––<br />

We have presented a list of the 'top ten' <strong>student</strong> concerns to a meeting<br />

of the maths <strong>and</strong> stats staff, together with a list of suggestions <strong>for</strong> better<br />

teaching practice.<br />

––<br />

The above in<strong>for</strong>mation is posted on the School L-drive under 'teaching<br />

<strong>and</strong> learning practices in<strong>for</strong>mation.'<br />

10.9 Sustainability <strong>and</strong> Transferability<br />

Has this project achieved a sustainable change in practice to improving<br />

<strong>student</strong> <strong>feedback</strong>?<br />

We have created a new position of Director of <strong>Learning</strong> <strong>and</strong> <strong>Teaching</strong> in the<br />

school whose role is to continue to transfer effective teaching <strong>and</strong> learning<br />

practices to other staff in the school <strong>and</strong> to encourage them to share their<br />

innovations with others in the school.<br />

What is planned in the School to extend the impact of the project beyond<br />

this team?<br />

––<br />

We have introduced an incentive <strong>for</strong> improving the good teaching score<br />

in the school by rewarding staff who have achieved significant<br />

improvements in their teaching.<br />

––<br />

Different groups in the school are responsible <strong>for</strong> improving the average<br />

teaching score <strong>for</strong> the group.<br />

––<br />

Improving the teaching score has become embedded as part of the work<br />

plan in the school.<br />

Have you observed changes/initiatives in your School, Portfolio or University<br />

wide that are attributed (directly or indirectly) as a result of your ART project?<br />

AV & IT <strong>and</strong> Property Services have become involved in supporting teaching<br />

problems as a direct result of this project.<br />

Are the outcomes of this project transferable to other parts of RMIT <strong>and</strong> / or<br />

the higher education sector?<br />

Yes, the successful practices can be summarised in a dot point document<br />

<strong>and</strong> staff can be encouraged to adopt them in their own teaching <strong>and</strong><br />

learning practices.<br />

Page 147

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!