You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Preventive Maintenance<br />
4.2. PREVENTIVE MAINTENANCE INTERVALS<br />
Preventive maintenance procedures are performed on B relays with the covers on and<br />
sealed. The tests are a good check on the overall performance of the relay, and are<br />
completed easily and quickly.<br />
Preventive maintenance consists of three procedures:<br />
• Visual Inspection<br />
• Electrical Test<br />
• Timing Test, where applicable<br />
Table 4–1 shows the recommended preventive maintenance time intervals.<br />
Table 4–1. Preventive Maintenance Intervals<br />
Relay <strong>Type</strong><br />
Preventive Maintenance Interval<br />
Carborne <strong>Relays</strong><br />
Every 6 years<br />
<strong>Vital</strong> Wayside <strong>Relays</strong><br />
Every 4 years<br />
DC Polar and Vane <strong>Relays</strong><br />
Every 2 years<br />
Master (or Primary) <strong>Relays</strong>, spring tension*<br />
Every 2 years<br />
Microchron II Timer <strong>Relays</strong><br />
Every year<br />
* Any master or primary relay of the torque type, that depends on spring tension to return contacts to the<br />
de-energized position in noncoded continuous inductive automatic train stop or train control systems.<br />
<strong>Vital</strong> wayside, DC Polar and Vane <strong>Relays</strong> can be inspected and tested while installed in<br />
racks or they may be removed from service and plugged on a shop test board for<br />
preventive maintenance. Electrical tests of relays in the relay racks are limited to<br />
measuring operating values and comparing the values to the specifications provided in<br />
the Engineering Data (ED) sheets. Relay drawing and catalog numbers can be used<br />
with Appendix A to look up the Engineering Data (ED) Sheet number. To determine a<br />
relay's drawing or catalog number, refer to Heading 1.2.2., Identification.<br />
Carborne and Master <strong>Relays</strong> must be removed from service for inspection and testing.<br />
Relay removal and installation procedures are provided in Section 6, Corrective<br />
maintenance.<br />
NOTE<br />
<strong>Relays</strong> not passing any of the preventive maintenance tests or inspections<br />
must be replaced and not returned to service until the operating<br />
characteristics and conditions are in accordance with <strong>Alstom</strong> Engineering<br />
Data (ED) sheet specifications.<br />
P1457, Rev. Nov/07 4–2 <strong>Alstom</strong> Signaling Inc.