15.04.2015 Views

Type B Vital Relays - Alstom

Type B Vital Relays - Alstom

Type B Vital Relays - Alstom

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Preventive Maintenance<br />

Table 4–2. Typical B1 Relay Visual Inspection Procedure (Cont.)<br />

Step<br />

Procedure<br />

4 Verify that normally open co-acting contacts meet squarely and simultaneously<br />

when relay is energized. Contacts should have wipe as armature goes through<br />

to its front stop.<br />

When relay is deenergized, normally closed contacts should meet squarely and<br />

simultaneously. Contacts should have wipe as armature goes to its backstop.<br />

During pick up and drop away, armature must move freely on its bearing plate.<br />

5 If components inside the cover are loose, mis-aligned, or required cleaning,<br />

remove and replace the relay.<br />

6 If a relay is removed for any reason during the inspection procedure, the<br />

mechanical tests in Section 6 may be performed as specified. The relay may not<br />

be returned to service until the operating characteristics and conditions are in<br />

accordance with <strong>Alstom</strong> ED sheet specifications.<br />

P1457, Rev. Nov/07 4–5 <strong>Alstom</strong> Signaling Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!