12.07.2015 Views

CCTNS nagaland_SI_RFP_Volume 1.pdf - National Crime Records ...

CCTNS nagaland_SI_RFP_Volume 1.pdf - National Crime Records ...

CCTNS nagaland_SI_RFP_Volume 1.pdf - National Crime Records ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Crime</strong> & Criminals Tracking Network and Systems ProjectNagaland PoliceSlNoSpecification• Power supplies should have N+N. All PowerSupplies modules should be populated in thechassis13 Hot Swappable and redundant Cooling UnitManagement• Systems Management and deployment tools toaid in Blade Server configuration and OSdeployment,• Remote management capabilities throughinternet browser• It should provide Secure Sockets Layer (SSL)128 bit encryption and Secure Shell (SSH)14Version 2 and support VPN for secure accessover internet.• Ability to measure power historically for serversor group of servers for optimum power usage• Blade enclosure should have provision toconnect to display console / central console forlocal management like trouble shooting,configuration, system status / health display15 Built in KVM switch or Virtual KVM feature over IP.Dedicated management network port should have16separate path for managementSupport heterogeneous environment: AMD, Xeonand RISC/EPIC CPU blades must be in same17 chassis with scope to run Win2003/2008 Server,Red Hat Linux / 64 Bit UNIX, Suse Linux / 64 BitUNIX / Solaris x86Complied(Y/N)Referenceto DataSheetValue Add (Ifany)/RemarksSoftware for Data Center & DR CenterCAS (State) will be developed in two distinct technology stacks by the Software Development Agencyat the Center. The details of the Technology Stacks are provided as Annexure II Details oftechnology stack-CAS (Center) and CAS (State) to this <strong>RFP</strong>. The <strong>SI</strong> is expected to bid with one ofthe technology stacks in response to this <strong>RFP</strong>. <strong>SI</strong> shall procure all necessary required software for DC& DR including Operating System, Database, and Other Software Licenses. All software licensesshould be in the name of Nagaland Police and should be a perpetual license, i.e. the software licenseshould not expire after the contract period. The software Licenses should be comprehensive and nofurther licenses should be required for DC and DR operations. The software installed shouldnecessarily be the latest version at the time of actual implementation. The <strong>SI</strong> shall procure allnecessary updates /patches / bug fixes for this software during the project cycle. The <strong>SI</strong> will alsoimplement the same from time to time as required after necessary approvals from Nagaland Police.Tuning of application, databases, third party software’s, and any other components provided as partof the solution to optimize the performance will be the responsibility of <strong>SI</strong>. The <strong>SI</strong> shall also applyregular patches to the licensed software including the operating system and databases as released bythe OEMs.The <strong>SI</strong> shall also provide services for software license management and control. <strong>SI</strong> shall maintaindata regarding entitlement for software updates, enhancements, refreshes, replacements, andmaintenance. <strong>SI</strong> should perform periodic audits to measure license compliance against the number ofvalid end user software licenses consistent with the terms and conditions of site license agreements,volume purchase agreements, and other mutually agreed upon licensed software terms andconditions and report to Nagaland Police.All the software licenses should be in the name of DGP, Nagaland.<strong>Volume</strong> I Request for Proposal for Selection of System Integrator Page 179 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!