12.07.2015 Views

CCTNS nagaland_SI_RFP_Volume 1.pdf - National Crime Records ...

CCTNS nagaland_SI_RFP_Volume 1.pdf - National Crime Records ...

CCTNS nagaland_SI_RFP_Volume 1.pdf - National Crime Records ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Crime</strong> & Criminals Tracking Network and Systems ProjectNagaland PoliceThe <strong>SI</strong> would ensure that developed solution is fully compliant with the requirements and specificationsprovided in the <strong>RFP</strong> such as functional, non-functional and technical requirements. For ensuring this, the<strong>SI</strong> shall prepare a Requirements Traceability Matrix on the basis of Functional RequirementsSpecifications (FRS), Non Functional Requirements Specification, and Technical Requirements providedby State (updated, expanded and fine-tuned by the <strong>SI</strong> as necessary) and the System RequirementsSpecifications (SRS) prepared by the <strong>SI</strong>. This matrix would keep track of the requirements and tracetheir compliance through different stages of the project including software design, coding, unit testingand acceptance testing. The Requirements Traceability Matrix would be a live document throughout theproject, with the <strong>SI</strong> team updating the matrix at every stage to reflect the meeting of each specification atevery stage.Through the duration of the project, the State Mission Team will periodically review theTraceability Matrix. State Governance Structure would provide the final approval on the advice of theState Mission Team and SPMU once they are satisfied that all requirements are met.Project DocumentationThe <strong>SI</strong> shall create and maintain all project documents that would be passed on to State as deliverablesas per the agreed project timelines. The documents created by the <strong>SI</strong> will be reviewed andapproved by the Governance Structure Setup in the State (Please refer to Annexure for details onGoverning Structure to be set up in the State). State would also approve any changes required to thesedocuments during the course of the project. State will finally sign-off on the documents on therecommendation of State Mission Team / SPMU / Empowered Committee.Project documents include but are not limited to the following:• Detailed Project Plan• Updated/vetted FRS• SRS document• HLD documents (including but not limited to)- Application architecture documents- ER diagrams and other data modeling documents- Logical and physical database design- Data dictionary and data definitions- Application component design including component deployment views, control flows, etc.• LLD documents (including but not limited to)- Application flows and logic including pseudo code- GUI design (screen design, navigation, etc.)• All Test Plans• Requirements Traceability Matrix• Change Management and Capacity Building Plans• SLA and Performance Monitoring Plan• Training and Knowledge Transfer Plans<strong>Volume</strong> I Request for Proposal for Selection of System Integrator Page 49 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!