12.07.2015 Views

CCTNS nagaland_SI_RFP_Volume 1.pdf - National Crime Records ...

CCTNS nagaland_SI_RFP_Volume 1.pdf - National Crime Records ...

CCTNS nagaland_SI_RFP_Volume 1.pdf - National Crime Records ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Crime</strong> & Criminals Tracking Network and Systems Project Nagaland PoliceS.No.6.Project ActivityProcurement of IT infrastructure at DataCentre and DRDeliverablesConfiguration, Customization, Extension and Integrationas per Nagaland Police’s requirements<strong>Volume</strong> I Request for Proposal for Selection of System Integrator Page 86 of 193Timelines (T - fromdate of signing ofcontract)T + 8 WeeksA detailed Design document including:T + 10 Weeksxii. Technical Architecture Document (Application, Network,and Security)xiii. High Level Design (including but not limited to)a. Application architecture documentsb. ER diagrams and other data modellingdocumentsc. Logical and physical database designd. Data dictionary and data definitions7. Preparation of Solution Design documentse. Application component design includingcomponent deployment views, control flows,etc.xiv. Low Level Design (including but not limited to)a. Application flows and logic including pseudocodeb. GUI design (screen design, navigation, etc.)c. Database architecture, including defining datastructure, data dictionary as per standards laiddownby GoI/ GoSxv. <strong>CCTNS</strong> Application Test Plans and Test Casesxvi. A site survey report detailing the current status of each T + 10 Weeks8. Site Surveysite and the enhancements to be made at each site (s)based on the State’s requirement and the guidelines ofMHA, NCRBxvii. Final BoM with Technical specifications for the IT T + 11 WeeksHardware, Network and other IT Infrastructure9. IT infrastructure sizingRequirementsxviii. Strategy for Data Centre and DR Sitexix. Report on the reusability of existing infrastructurexx. Hardware procurement & Deployment plan10. Others xxi. Data Migration Strategy and Methodology T+11 Weeks11. Commissioning and operationalization of IT T + 11 Weeks

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!