12.07.2015 Views

Town of Summerville Planning Area - BCD Council of Governments

Town of Summerville Planning Area - BCD Council of Governments

Town of Summerville Planning Area - BCD Council of Governments

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 2.8 ‐ Capacity increase with Median (Bacons Bridge Rd – 2 to 4 Lanes)50000Number <strong>of</strong> Vehicles40000300002000010000Continuous Middle Turn LaneLandscaped Median0VolumeCapacityData: C & B Traffic PlanAlternative Scenarios – Suggested by the <strong>Planning</strong> CommissionTwo alternatives were suggested by members <strong>of</strong> the <strong>Planning</strong> Commission for Bacons Bridge Road. Thefirst alternative identified in Figure 2.9 is to widen Bacons Bridge Road from two to four lanes with alandscaped median, but retaining a two lane section between Edisto Road and Crestwood Drive to avoidwidening the bridge over Dorchester Creek; this reduces capacity for the section between Edisto Road andCrestwood Drive and consequently the level <strong>of</strong> service fails.The scenario identified in Figure 2.10 is to forgo the widening <strong>of</strong> Bacons Bridge Road, and to construct amedian between the two existing travel lanes. This alternative also reduces capacity for that particularsection, thus increasing corridor congestion. Therefore, both scenarios 2.9 and 2.10 are unsuccessful ineliminating congestion and increasing travel capacity along the full extent <strong>of</strong> Bacons Bridge Road.Figure 2.9 – Roadway LOS with twolane section between Edisto Road andCrestwood DriveFigure 2.10 ‐ Roadway LOS with only aplanted medianAppendix 1: <strong>BCD</strong>COG Travel Demand Modeling Scenarios Page 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!