12.07.2015 Views

budget for aviation and dulles corridor enterprise funds

budget for aviation and dulles corridor enterprise funds

budget for aviation and dulles corridor enterprise funds

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Capital Construction Program2012 BUDGET METROPOLITAN WASHINGTON AIRPORTS AUTHORITYWASHINGTON DULLES INTERNATIONAL AIRPORTRED BK FUNDING 2012 NEW 2011-2016NUM PROJ SOURCE/ PROGRAM PROGRAMEXPENDITURESIAD NUM DESCRIPTION REQUIREMENT CARRYOVER AUTHORIZATION AUTHORIZATION 2011 2012 2013 2014 - 2016 Unscheduled908 3616 Concourse B Building Adaptations <strong>for</strong> the AeroTrain(East/West)Bonds13,889,000 - 13,889,000 - - - - 13,889,000Concourse B Building Adaptations <strong>for</strong> the AeroTrainPFC4(East/West)- - - - - - - -Total 13,889,000 - 13,889,000 - - - - 13,889,000909 3617 Concourse B Building Adaptations <strong>for</strong> the IAB AeroTrain Bonds 46,377,000 - 46,377,000 - - - 1,816,000 44,561,000910 3618 Walkback Tunnel, Tier 1 to Tier 2 Bonds 41,367,000 - 41,367,000 - - - - 41,367,000Walkback Tunnel, Tier 1 to Tier 2 LOI 34,600,000 - 34,600,000 - - - - 34,600,000Total 75,967,000 - 75,967,000 - - - - 75,967,000912 3619 High Speed Conveyor Baggage System (Main Terminal toTier 2)Bonds81,022,000 - 81,022,000 - - - 1,508,000 79,514,000913 3620 IAB AeroTrain Stations, Tunnels & System Bonds 248,391,000 - 248,391,000 - - - 2,794,000 245,597,000IAB AeroTrain Stations, ti Tunnels & System PFC4 2,347,000 - 2,347,000 - - - 1,271,000 1,076,000000Total 250,738,000 - 250,738,000 - - - 4,065,000 246,673,000914 3621 AeroTrain - Tier 1 to Tier 2 Bonds 103,388,000 - 103,388,000 - - - - 103,388,000AeroTrain - Tier 1 to Tier 2 PFC4 - - - - - - - -Total 103,388,000 - 103,388,000 - - - - 103,388,000915 3622 AeroTrain - Tier 3 East Increment (non-service) Bonds 13,760,000 - 13,760,000 - - - 13,760,000 -AeroTrain - Tier 3 East Increment (non-service) PFC4 - - - - - - - -Total 13,760,000 - 13,760,000 - - - 13,760,000 -918 3624 New Engineering <strong>and</strong> Maintenance Facility - Phase I Bonds 4,445,000 - 4,445,000 - - - - 4,445,000919 3625 Maintenance Equipment <strong>and</strong> Storage Warehouse Bonds 3,499,000 - 3,499,000 - - - - 3,499,000920 3626 Baggage Conveyor Tunnels to Tier 2 Bonds 145,610,000 - 145,610,000 1,047,000 144,563,000921 3627 Cargo Building Phase III <strong>and</strong> 7 Bonds 12,248,000 - 12,248,000 - - - - 12,248,000969 3681 Concourse B West Expansion Basement Bonds 100,000 - 100,000 - - - 100,000 -450 Concourse B West Expansion Basement PFC4 5,908,000 - 5,908,000 1,153,000 646,000 - 4,109,000 -Total 6,008,000 - 6,008,000 1,153,000 646,000 - 4,209,000 -875 Conveyor <strong>and</strong> Building Changes <strong>for</strong> Inline BaggageScreening3696&3820TSA/CVG139,290,000 - 139,290,000 25,854,750 48,531,500 52,613,000 12,290,750 -Conveyor <strong>and</strong> Building Changes <strong>for</strong> Inline BaggageBondsScreening57,480,000 - 57,480,000 15,576,250 11,319,500 10,000,000 20,584,250 -Total 196,770,000 - 196,770,000 41,431,000 59,851,000 62,613,000 32,875,000 -158

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!