12.07.2015 Views

budget for aviation and dulles corridor enterprise funds

budget for aviation and dulles corridor enterprise funds

budget for aviation and dulles corridor enterprise funds

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2012 BUDGETMetropolitan Washington Airports Authority2012 Aviation Capital, Operating <strong>and</strong> Maintenance Investment ProgramThe COMIP provides <strong>for</strong> ongoing major repair work at the Airports, including airfield <strong>and</strong>roadway rehabilitation, utility system repairs, <strong>and</strong> rehabilitation of buildings, in addition toAirports Authority initiatives. Of the $42.6 million, $29.3 million will be funded from theAirports Authority’s 2011 share of NRR <strong>and</strong> $13.0 million will be funded throughreprogramming available COMIP <strong>funds</strong> no longer needed <strong>for</strong> previously authorized projects.Funding Source: Net Remaining Revenue (NRR) $42,580,000<strong>and</strong> reprogrammingsNew program authority <strong>for</strong> the COMIP in 2012:Table 3-3(a)NewAuthorizationConsolidated FunctionsEquipment (4 Copiers) $ 95,000Document Management Support 200,000Pitney Bowes Mail Machine 35,000Consultant Support <strong>for</strong> Use <strong>and</strong> Lease Agreement 250,000Claim Reserve Account 750,000Public Safety Fire Vehicles (3) 135,000Public Safety Police Vehicles (6) 200,000Public Safety Police Vehicles K9 30,000Authority's MetroRail Contribution <strong>for</strong> Non-PFC Eligible Costs 5,000,000Total Consolidated Functions $ 6,695,000Ronald Reagan Washington National AirportStorm Drain Replacement (South Area) $ 700,000Airfield Pavement 500,000Public Safety Communication Center (PSCC) Supplemental HVAC 150,000Dedicated Fire System/Domestic Water - Williams Hydrant 40,000Security Camera Digital Video Recorder Replacement 200,000Electrical Coordination Study 100,000Cooling <strong>for</strong> Terminal B/C Electrical Substations 450,000Replace Old Street Light Poles 150,000Garage C Elevator Rehabilitation 300,000Garage A Elevator Rehabilitation 350,000Terminal A Restroom Renovations 900,000Outbound Baggage H<strong>and</strong>ling System Refurbishment 200,000Hangar 4 Roof Replacement 600,000South Hangar Line Exterior Painting 500,000Terminal B/C Corrosion Prevention 100,000Environmental <strong>and</strong> Building Code Compliance 417,000Safety Management Systems (SMS) 150,000Replace Servers 250,000Garage Seal Coat 125,000Exterior Electric Shop HVAC 100,000Planning & Programming Studies 500,00040

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!