12.07.2015 Views

budget for aviation and dulles corridor enterprise funds

budget for aviation and dulles corridor enterprise funds

budget for aviation and dulles corridor enterprise funds

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Mr. Charles D. SnellingPage 14 of 172012 Dulles Corridor Operating Revenues <strong>and</strong> Interest IncomeTable 1-9 BUDGET BUDGET Dollar Percent2011 2012 Change ChangeElectronic Toll Collection $ 67,990,000 $ 74,973,000 $ 6,983,000 10.3%Cash Toll Revenue 29,138,000 32,131,000 2,993,000 10.3%Violations Fee Collection 719,000 719,000 - 0.0%Total Operating Revenues $ 97,847,000 $ 107,823,000 $ 9,976,000 10.2%Interest Income $ 3,655,000 $ 1,010,000 $ (2,645,000) -72.4%2012 Dulles Corridor Operation <strong>and</strong> Maintenance ProgramTable 1-10 BUDGET BUDGET Dollar Percent2011 2012 Change ChangeOperating Expenses $ 27,843,000 $ 28,746,000 $ 903,0003.2%Debt Service 51,142,000 50,079,000 (1,063,000) -2.1%Total O&M Program $ 78,985,000 $ 78,825,000 $ (160,000) -0.2%Dulles Toll Road Renewal <strong>and</strong> Replacement ProgramThe 2012 Renewal <strong>and</strong> Replacement Program expenditures include $10.6 million<strong>for</strong> various projects including a study of toll plaza modifications, security systems, bridgemaintenance, signage upgrade study, <strong>and</strong> sound wall repairs. The 2012 estimate <strong>for</strong>new program authorization is $6.2 million.Renewal <strong>and</strong> Replacement ProgramTable 1-11NewAuthorizationRenewal <strong>and</strong> Replacement ProgramBridges, Structures <strong>and</strong> Canopy Repairs $ 500,000Erosion Repairs 200,000Joint Replacement <strong>and</strong> Repair 100,000Federal Highways Bridge Inspection 100,000Repair of Sound Walls 200,000Dulles Toll Road Mainlane Pavement Repairs 500,000Roadway Sign Replacement <strong>and</strong> Rehabilitation 200,000Street/Plaza Lighting Rehabilitation 170,000Sign Lighting 115,000Bridge/Structural Management System Program 130,000Other Planning <strong>and</strong> Programming 75,000Electrical 500,000Code Compliance - Electrical Room 300,000HVAC 300,000Utility Survey <strong>and</strong> Rehabilitation 250,000Replacement Cameras 50,000Claim Reserve 1,300,000Emergency Snow 1,200,000Total Dulles Corridor Renewal <strong>and</strong> Replacement Program $ 6,190,000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!