12.07.2015 Views

budget for aviation and dulles corridor enterprise funds

budget for aviation and dulles corridor enterprise funds

budget for aviation and dulles corridor enterprise funds

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Capital Construction Program2012 BUDGET METROPOLITAN WASHINGTON AIRPORTS AUTHORITYWASHINGTON DULLES INTERNATIONAL AIRPORTRED BK FUNDING 2012 NEW 2011-2016NUM PROJ SOURCE/ PROGRAM PROGRAMEXPENDITURESIAD NUM DESCRIPTION REQUIREMENT CARRYOVER AUTHORIZATION AUTHORIZATION 2011 2012 2013 2014 - 2016 Unscheduled875 3697 Concourse C/D Rehabilitation Bonds 34,027,000 - 34,027,000 12,091,000 18,413,000 3,523,000 - -875 3706 Airline Commuter Facilities Bonds 24,046,000 - 24,046,000 - - - - 24,046,000800 3719 Tier 3 East Concourse/Automated AeroTrain Station Bonds 573,168,000 - 573,168,000 - - - 156,000 573,012,000800 3720 Airport AOA Security Cameras Bonds 289,000 - 289,000 289,000 - - - -800 3721 Main Terminal Exp. Joint Replacement Bonds 1,568,000 - 1,568,000 272,000 - - - 1,296,000800 3722 Concourse Modifictions <strong>for</strong> Airbus A-380 Bonds 4,654,000 - 4,654,000 154,000 2,561,000 1,939,000 - -800 3747 Dulles Police Station Bonds 160,000 - 160,000 160,000 - - - -800 3748 International Arrivals Building (IAB) Exp. Bonds 62,250,000 - 62,250,000 9,039,000 4,318,000 - - 48,893,000800 3749 Airport Rescue <strong>and</strong> Fire Fighting Facility - Station 304Bonds(includes Roads <strong>and</strong> Utilities)1,905,000 , - 1,905,000 , 1,905,000 ,- - - -800 3790 Consolidated Rental Car Facility (Design) Bonds 12,737,000 - 12,737,000 - - - - 12,737,000800 3791 North Area Maintenance Facility Bonds 1,313,000 - 1,313,000 176,000 288,000 - - 849,000800 3845 Historic ATCT Facilities Life Safety Preservation Phase 1 Bonds 445,000 - 445,000 34,000 411,000 - - -800 3846 Interim AeroTrain Fixed Facility Maintenance Bonds 705,000 - 705,000 300,000 - - 405,000 -800 3847 Main Terminal South Finger Configuration Bonds 1,508,000 - 1,508,000 586,000 - - - 922,000800 3848 Main Terminal Mezzanine Security Checkpoint Bonds 849,000 - 849,000 359,000 - - - 490,000800 3849 Restroom Renovation Program (Main Terminal) Bonds 2,893,000 - 2,893,000 805,000 1,088,000 1,000,000 - -800 3865 Gates A27-A31 (B27-B31) Sterile Corridor Restoration Bonds 1,302,000 - 1,302,000 553,000 749,000 - - -116 4708 Tenant Relocation Bonds 1,851,000 - 1,851,000 1,000 1,850,000 - - -800 3914 Historic ATCT Exterior Preservation Phase 1B Bonds 2,000,000 4,650,000 6,650,000 200,000 3,550,000 2,900,000 - -800 3915 Main Terminal Commissioning Phase 2 Bonds 4,980,000 - 4,980,000 165,000 3,936,000 879,000 - -800 3916 International Arrivals Bldg. (IAB) Exp. Phase 4 Bonds 1,900,000 - 1,900,000 418,000 1,482,000 - - -800 3917 Joint Firearm Training Facility Bonds 19,000,000 - 19,000,000 41,000 - - - 18,959,000159

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!