12.07.2015 Views

CA Workload Automation iXp User Guide - CA Technologies

CA Workload Automation iXp User Guide - CA Technologies

CA Workload Automation iXp User Guide - CA Technologies

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Graphical Views3.2.3.2 Job Flow View OrderIn the Job Flow View, the jobs are arranged in the following ways:1. Largest jobstreams (set of related jobs—jobs in boxes and jobs thatdepend on each other) at top left.2. Smaller jobstreams are spaced across the top (or side if streaming top tobottom). Additional jobstreams are centered under each jobstream in thetop row.3. All jobs with no dependencies are grouped together4. All other things being equal (size, number and position of predecessors,number and position of successors, how many joids occur between thetwo compared joids), jobs with a higher JOID (i.e. jobs that were definedlater) will be below or to the right of jobs with lower JOIDs.Jobs that are contained in the same box or Level-0 jobs, once they have beengrouped, are positioned using the following criteria:• size of job or box• number and position of predecessorsVIEWING JOBS 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!