13.07.2015 Views

Register your product now - Radiometer Analytical

Register your product now - Radiometer Analytical

Register your product now - Radiometer Analytical

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.5.1 Before starting a sequenceCheck that the cell (electrodes or RCB200 Resistor Capacitor Box) is connected tothe potentiostat. Check that the potentiostat is connected to the PC and is correctlydeclared in the “Instrument setup” dialogue box.See Section 3, Chapter 5 “Setup <strong>your</strong> instrument”, page 33.4.5.2 Run the sequence1. Start the sequenceFrom the “Laboratory logbook” window of the sequence, click the icon orpress the F5 function key or select the “Run” menu of the menu bar then the“Start...” command. VoltaMaster 4 first checks the communication between thecomputer and the potentiostat and compare the potentiostat declared in the“Instrument setup” dialogue box with the actual instrument. If there is a difference,an error message is displayed (The detected instrument does not correspond tothe one selected) and you must resume the error in the “Instrument setup” beforestarting the sequence. Then, VoltaMaster 4 checks that the methods defined inthe sequence can be run with the potentiostat declared in the “Instrument setup”.If there is a problem, an error message is displayed (Impossible to execute thesequence with this instrument) meaning that you must check the sequence editionand remove some methods from this sequence. See Section 4, Chapter 8 “Errormessages”.2. The Run barWhile a sequence is in progress, VoltaMaster 4 displays the PC communicationport in use and experimental data for the method performed (measured potentialand/or current, measurement drift, time elapsed since method starts, etc.). Thesedata are displayed in the Run bar.Consult the Help file, keyword index:Run bar.3. The progress barWhile a sequence is in progress, VoltaMaster 4 displays the progress bar. This barshows the percentage completed of a method run in progress.VoltaMaster 4 - Version 7.0x 71Section 4, Chapter 5: Running a sequence

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!