13.07.2015 Views

miRS-tonpon - Sturmpanzer.com

miRS-tonpon - Sturmpanzer.com

miRS-tonpon - Sturmpanzer.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1 E&U iThe German Staterepresented byThe Organisation Todt, Einsatzgruppe West, OBL CHERBOURG,<strong>com</strong>missions the First Party, hereinafter called HU, withconstruction tasks and works as set out in the annexe whichthe HU transfers to the Second Party, hereinafter called NU,on the instructions of and for the OT.Para* 1 - General1. The following apply as integral parts of the contract:­(a)(b)(c)Auftragsbedingungen der OT fur die Ausftthrung vonBauleistungen zu Leistungspreisen. ( OT-Leistungsvertrag)..(job specifications of the Todt Organisation for theExecution of Building Works at Unit prices (EfficiencyOutput Contract)) issue of May 1943*Leistungsverzeichnis zum Rahmenbauvertrag Bunkerbau*(The Works Schedule to the Frame-building Contract,Pill-boxes) West, of the Todt Organisation, issue ofMay 1943.Die Verordnung ttber die Baupreisbildung (BFVO)(The Order on Calculating Building Prices).2* Alteration of the details of this contract does not affect thecontract provided they do not constitute a <strong>com</strong>plete change inthe order*3* The NU must not further sub-contract the carrying out of the workaccepted, either in whole or in part*4* This contract between HU and NU, including all extra work, requiresthe approval of the OT in order to be valid.Para. 2 - Pricing and Accounting for theWork Done1. The building work done will be charged for on the basis of theprices of the Leistungsverzeichnis (Works Schedule)*2. The prices which apply are those of the " Leistungsverzeichnis zumRahmenbauvertrag Bunkerbau West" (Works Schedule to the Frame-BuildingContract, Pill-boxes, West), issue of June 1943* They are contractprices in the sense as defined in the Auftragsbedingungen (JobSpecifications) para. 15 V*3. Modifications of the section PI of the contract prices aregoverned by Section IB of the preamble to the Leistungsverzeichnis(Works Schedule). Sections Ps of the prices to be changed are to formthe basis, without alteration, of the charge in accordance withJob Specifications Para 14, section 9, in conjunction with JobSpecifications Para. 16, No* HI*4* For modifications of the sections PI of the contract prices, themodifioafclonfactors (see preamble to the Works Schedule, Section IB)are fixed atF 1 = 0.60 and F 2 = 1.60-69 ­

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!