Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Feasibility Investigation – Auburn Maintenance Facility – <strong>RailCorp</strong> Staff Facilities<br />
Construction Requirements Summary - Concept<br />
Design Discipline: Electrical Services<br />
Component:<br />
Reference Drawings / Sketches:<br />
Maximum electrical demand<br />
Description of Works proposed:<br />
SP1 Existing Office Area ⌧ SP2 New External Facility �<br />
Provide a power supply to the AMF Railcorp Staff Facilities<br />
Listing of proposed Works (Part 1 - Modification Works) Comment (if needed)<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
7.<br />
8.<br />
Cont’d<br />
HV-028 AMF <strong>RailCorp</strong> Staff Facilities Construction Requirements Summary Pg 1 of 2