16.12.2012 Views

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Feasibility Investigation – Auburn Maintenance Facility – <strong>RailCorp</strong> Staff Facilities<br />

Construction Requirements Summary - Concept<br />

Design Discipline: Electrical Services<br />

Component:<br />

Reference Drawings / Sketches:<br />

Maximum electrical demand<br />

Description of Works proposed:<br />

SP1 Existing Office Area ⌧ SP2 New External Facility �<br />

Provide a power supply to the AMF Railcorp Staff Facilities<br />

Listing of proposed Works (Part 1 - Modification Works) Comment (if needed)<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

Cont’d<br />

HV-028 AMF <strong>RailCorp</strong> Staff Facilities Construction Requirements Summary Pg 1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!