RAIL CORPORATION NEW SOUTH WALES<br />

8.4 OTHER<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

At all stages design and construction must make provision for future works as detailed in<br />

this specification and the accompanying schematics. Specifically, any cable conduits, pits or<br />

ducting required for signalling & telecoms cabling shall be provided, where necessary,<br />

during construction irrespective of whether they are relevant to that particular stage or future<br />

works. Similarly, provision must be made at every stage for buildings and equipment cases<br />

required for signalling & telecoms equipment.<br />

01/09/2010 – v7 Page 16 of 40