RAIL CORPORATION NEW SOUTH WALES<br />
10.3.7.3 Reliability / Availability<br />
ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />
MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />
ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />
The control system must consist of a duplicated computer-based VDU (Visual Display Unit)<br />
system with automatic changeover (Hot Standby) facilities – to switch between computers in<br />
the event of one computer failing.<br />
The changeover between systems shall not affect availability of the overall signalling<br />
system.<br />
10.3.7.4 Operator Interface<br />
The Train Control System must have operator input controls and screen displays based on<br />
<strong>RailCorp</strong> standards. LCD wide-screen displays to be provided for the controller’s<br />
workstation.<br />
The control system must be capable of controlling and displaying, over the control area, the<br />
following:<br />
Item Control Display<br />
<strong>Trains</strong> operating within the <strong>PPP</strong> Yard Area Yes Yes<br />
<strong>Trains</strong> entering / leaving the <strong>PPP</strong> Yard Area<br />
at the interfaces with the adjacent <strong>RailCorp</strong><br />
network<br />
<strong>Trains</strong> approaching (on the <strong>RailCorp</strong> lines)<br />
the interfaces between the <strong>PPP</strong> Yard Area<br />
& <strong>RailCorp</strong> network<br />
Yes (Dual control in conjunction<br />
with the relevant <strong>RailCorp</strong><br />
signaller)<br />
01/09/2010 – v7 Page 28 of 40<br />
Yes<br />
No (Under <strong>RailCorp</strong> control) Yes<br />
Notes: The exact requirements for the control of signal routes, for all stages, are detailed in<br />
section 9.3.6<br />
The information displayed by the control system to the controller must provide all the<br />
information covered in the standards, including the following:<br />
Item Comment<br />
Train location Track circuit occupancy – individual track<br />
circuit resolution is required<br />
Train Identification Train Description required for trains standing<br />
at Departure signals waiting for clearance to<br />
enter the <strong>RailCorp</strong> network. (Train<br />
Description required for trains entering the<br />
<strong>PPP</strong> Yard from the <strong>RailCorp</strong> network - Stage<br />
3 only)