Feasibility Investigation – Auburn Maintenance Facility – <strong>RailCorp</strong> Staff Facilities<br />

Construction Requirements Summary - Concept<br />

Design Discipline: COMMUNICATIONS AND IT<br />

Component:<br />

Reference Drawings / Sketches:<br />

Caldis Cook Group – POD Option Drawing A-003<br />

Description of Works proposed:<br />

SP1 Existing Office Area ⌧ SP2 New External Facility �<br />

Provision of Desk Telephones & IT Network in for revised office layout<br />

Assumptions:<br />

Telephones will be provisioned as VoIP over <strong>RailCorp</strong> ICT Network<br />

Phones will be capable of providing data port for PC connection<br />

Single Data Outlet will serve Phone and PC solution (to minimize excessive wiring cost)<br />

Each Desk will have a one Phone/Date outlet<br />

Second Data connection required in Training/Meeting rooms<br />

Listing of proposed Works (Part 1 - Modification Works) Comment (if needed)<br />

1. Removal of ceiling in MF to gain access to existing Comms and IT cable<br />

trays from existing IT room to cable route adjacent to Standing Road West<br />

4.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

Cont’d<br />

Required to enable new cables to be laid.<br />

HV-028 AMF <strong>RailCorp</strong> Staff Facilities Construction Requirements Summary Pg 1 of 3