Feasibility Investigation – Auburn Maintenance Facility – <strong>RailCorp</strong> Staff Facilities<br />
Construction Requirements Summary - Concept<br />
Design Discipline: COMMUNICATIONS AND IT<br />
Component:<br />
Reference Drawings / Sketches:<br />
Caldis Cook Group – POD Option Drawing A-003<br />
Description of Works proposed:<br />
SP1 Existing Office Area ⌧ SP2 New External Facility �<br />
Provision of Desk Telephones & IT Network in for revised office layout<br />
Assumptions:<br />
Telephones will be provisioned as VoIP over <strong>RailCorp</strong> ICT Network<br />
Phones will be capable of providing data port for PC connection<br />
Single Data Outlet will serve Phone and PC solution (to minimize excessive wiring cost)<br />
Each Desk will have a one Phone/Date outlet<br />
Second Data connection required in Training/Meeting rooms<br />
Listing of proposed Works (Part 1 - Modification Works) Comment (if needed)<br />
1. Removal of ceiling in MF to gain access to existing Comms and IT cable<br />
trays from existing IT room to cable route adjacent to Standing Road West<br />
4.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
Cont’d<br />
Required to enable new cables to be laid.<br />
HV-028 AMF <strong>RailCorp</strong> Staff Facilities Construction Requirements Summary Pg 1 of 3