RAIL CORPORATION NEW SOUTH WALES<br />

10.3.4 SIGNALLING EQUIPMENT BUILDINGS AND HOUSINGS<br />

10.3.4.1 Equipment Buildings<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

Three (3) Signalling equipment buildings / bungalows are required as shown on the concept<br />

signalling schematic drawings.<br />

The buildings are to be designed and constructed by <strong>PPP</strong> Co. (using awnings, external<br />

shades, forced airflow or other appropriate construction methods) to ensure the heat control<br />

inside the buildings is:<br />

• Compatible with the requirements of the equipment installed within the buildings<br />

• Maintained at an acceptable temperature for maintenance staff to work within the<br />

building at all times of the year<br />

Notes:<br />

1) The number, size and positioning of these signalling equipment buildings are indicative<br />

only. The exact number required, their size and location will depend on the final system<br />

design.<br />

2) For tendering purposes it should be assumed that the size of the buildings will be 6m by<br />

4m.<br />

10.3.4.2 Location Cases<br />

<strong>Double</strong> skinned stainless steel location cases, with flow through ventilation, are to be<br />

provided by <strong>PPP</strong> Co. as required by the final design. The cases are to be designed and<br />

installed to ensure the heat control inside the cases is compatible with the requirements of<br />

the equipment installed within the cases, and to maintain internal temperatures at ambient.<br />

Note: The number and positioning of these location cases, as shown on the concept<br />

signalling schematic, are indicative only. The exact number required and their location will<br />

depend on the final design.<br />

10.3.5 SIGNALLING POWER SUPPLY<br />

The Signalling power supply will be provided by <strong>PPP</strong> Co. from one central point and<br />

reticulated throughout the Yard area<br />

The following power supply arrangements are required at the central power supply location<br />

• Dual supplies – “Normal” and “Standby” with automatic changeover facilities.<br />

• Power distribution (signalling mains) between signalling locations can be at Voltages up<br />

to 415V AC. The signalling distribution mains must be transformed down to a nominal<br />

120 volts (at the signal equipment locations) for operating the signalling equipment.<br />

• Changeover from the Normal supply to the Standby supply and back again must not<br />

cause any disruption to the signalling system. Line conditioners and UPS systems are<br />