Rail Corporation New South Wales<br />

<strong>Rolling</strong> <strong>Stock</strong> <strong>PPP</strong> – <strong>Double</strong> <strong>Deck</strong> <strong>Trains</strong><br />

Maintenance Facility Works Specification<br />

<strong>Exhibit</strong> 7 - MFS v7.doc<br />

These Storage Roads must be provided in addition to the enclosed<br />

Maintenance Roads within the Maintenance Building and the Standing Roads<br />

immediately before and after the Maintenance Roads.<br />

3.1.4.3 Standing Roads<br />

The Site Trackwork is to include six (6) Standing Roads on the Auburn side of<br />

the Maintenance Building (Standing Roads East) and six (6) Standing Roads on<br />

the Clyde side of the Maintenance Building (Standing Roads West). The<br />

Standing Roads shall be treated as examination sidings.<br />

The Standing Roads must be of sufficient length to stand an 8-car set of at least<br />

163 m length clear of the Maintenance Roads and Maintenance Building and all<br />

turnouts and signalling and must not restrict access to any other Storage<br />

Roads, Maintenance Roads or building stores areas.<br />

The Standing Roads East are to be connected to the Storage Roads such that<br />

all Storage Roads are connected to all Standing Roads. The design of the<br />

Standing Roads East must be such that the Storage Roads are capable of<br />

being fully signalled. It is noted that the diamond crossover shown on the<br />

<strong>RailCorp</strong> Maintenance Facility Reference Design is a 1:3.5 type.<br />

The Standing Roads West are to connect each of the Maintenance Roads to<br />

the access points on the Down Relief line. These roads are also to provide<br />

roads for the handover and pick-up of sets by <strong>RailCorp</strong>. The design of the<br />

Standing Roads West must be such that the sets standing on these roads are<br />

clear of the vehicular/pedestrian access crossing over the roads, and signalling<br />

and other operational requirements for access to the Down Relief line.<br />

3.1.4.4 Bypass Road 1<br />

<strong>PPP</strong> Co must provide a Bypass Road 1 as part of the Site Trackwork. This<br />

Bypass Road 1 must allow trains to access the Maintenance Facility, MainTrain,<br />

and travel through the Maintenance Site from and to the Down Relief line<br />

without needing to use the Maintenance Roads.<br />

The Bypass Road 1 must provide the access points to MainTrain as shown in<br />

the <strong>RailCorp</strong> Maintenance Facility Reference Design.<br />

3.1.4.5 Access Road 1<br />

The Site Trackwork is to include an Access Road 1 connecting the Storage<br />

Roads to the Down Relief line. The design of the Access Road 1 must be such<br />

that an 8-car set of 192 m length can stand clear of all turnouts and signalling<br />

requirements at both ends of the road.<br />

Until such time as the Down Relief line is fully commissioned as main line,<br />

<strong>RailCorp</strong> requires control of the movements at the intermediate turnout<br />

connecting the Access Road 1 to the Commissioning Track to be via Yard<br />

Control.<br />

v7 – 17/01/2011 Page 13 of 51