Rail Corporation New South Wales<br />
<strong>Rolling</strong> <strong>Stock</strong> <strong>PPP</strong> – <strong>Double</strong> <strong>Deck</strong> <strong>Trains</strong><br />
Maintenance Facility Works Specification<br />
<strong>Exhibit</strong> 7 - MFS v7.doc<br />
These Storage Roads must be provided in addition to the enclosed<br />
Maintenance Roads within the Maintenance Building and the Standing Roads<br />
immediately before and after the Maintenance Roads.<br />
3.1.4.3 Standing Roads<br />
The Site Trackwork is to include six (6) Standing Roads on the Auburn side of<br />
the Maintenance Building (Standing Roads East) and six (6) Standing Roads on<br />
the Clyde side of the Maintenance Building (Standing Roads West). The<br />
Standing Roads shall be treated as examination sidings.<br />
The Standing Roads must be of sufficient length to stand an 8-car set of at least<br />
163 m length clear of the Maintenance Roads and Maintenance Building and all<br />
turnouts and signalling and must not restrict access to any other Storage<br />
Roads, Maintenance Roads or building stores areas.<br />
The Standing Roads East are to be connected to the Storage Roads such that<br />
all Storage Roads are connected to all Standing Roads. The design of the<br />
Standing Roads East must be such that the Storage Roads are capable of<br />
being fully signalled. It is noted that the diamond crossover shown on the<br />
<strong>RailCorp</strong> Maintenance Facility Reference Design is a 1:3.5 type.<br />
The Standing Roads West are to connect each of the Maintenance Roads to<br />
the access points on the Down Relief line. These roads are also to provide<br />
roads for the handover and pick-up of sets by <strong>RailCorp</strong>. The design of the<br />
Standing Roads West must be such that the sets standing on these roads are<br />
clear of the vehicular/pedestrian access crossing over the roads, and signalling<br />
and other operational requirements for access to the Down Relief line.<br />
3.1.4.4 Bypass Road 1<br />
<strong>PPP</strong> Co must provide a Bypass Road 1 as part of the Site Trackwork. This<br />
Bypass Road 1 must allow trains to access the Maintenance Facility, MainTrain,<br />
and travel through the Maintenance Site from and to the Down Relief line<br />
without needing to use the Maintenance Roads.<br />
The Bypass Road 1 must provide the access points to MainTrain as shown in<br />
the <strong>RailCorp</strong> Maintenance Facility Reference Design.<br />
3.1.4.5 Access Road 1<br />
The Site Trackwork is to include an Access Road 1 connecting the Storage<br />
Roads to the Down Relief line. The design of the Access Road 1 must be such<br />
that an 8-car set of 192 m length can stand clear of all turnouts and signalling<br />
requirements at both ends of the road.<br />
Until such time as the Down Relief line is fully commissioned as main line,<br />
<strong>RailCorp</strong> requires control of the movements at the intermediate turnout<br />
connecting the Access Road 1 to the Commissioning Track to be via Yard<br />
Control.<br />
v7 – 17/01/2011 Page 13 of 51