RAIL CORPORATION NEW SOUTH WALES<br />

3 OPERATIONAL OBJECTIVES<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

The key operational objective of the <strong>PPP</strong> Maintenance Facility is to maintain a fleet of 1000<br />

cars comprising the <strong>PPP</strong> Co. Sets and, other <strong>RailCorp</strong> trains. This will include<br />

commissioning of new sets.<br />

Other operational objectives include:<br />

1. The site will be also used for washing of <strong>RailCorp</strong> trains.<br />

2. Accommodate and maintain <strong>RailCorp</strong> electric trains and Sets of 163m length with<br />

provision for 192m trains at nominated locations.<br />

3. Primary access to the facility from the Down Relief with:<br />

• Two turnouts at the Auburn end utilising existing turnouts numbers No.49 and<br />

No.52.<br />

• Two new turnouts at the Clyde end.<br />

• Network access to the Down Relief via Clyburn Junction<br />

4. Secondary access (Access Road 1) to the Down Relief from Storage Roads 1-4 for<br />

additional flexibility and access reliability.<br />

5. Ability to directly access the UWPP and train Washplant facilities from any of the<br />

Storage Roads.<br />

6. Ability to shunt between all Storage Roads and all Standing Roads East.<br />

7. Capability for <strong>RailCorp</strong> crew to deliver sets to, and pick up sets from,<br />

• the Storage Roads;<br />

• the Standing Roads West;<br />

• the UWPP; and<br />

• the Washplant.<br />

8. All storage and standing roads or zones are to be provided with clearances for<br />

signalling, catchpoints and any other operational requirements to prevent fouling<br />

points etc.<br />

9. Access to the MainTrain siding and facilities<br />

10. Car Turning Loop road around western side of MainTrain facility with minimal land<br />

take.<br />

11. Bypass road around the <strong>PPP</strong> Maintenance Facility.<br />

12. Provision is to be made to restrict facilities being constructed within the train run-off<br />

areas from the Catchpoints to provide both a safe run-off area and to limit damage<br />

should trains run-off into these areas.<br />

13. The Down Relief is to be used as a Commissioning Track by the <strong>PPP</strong> Co. during<br />

stage 1.<br />

14. Provision for incorporation of the Future <strong>RailCorp</strong> Development.<br />

Note: The facilities (listed above) and flexibility of the maintenance facility will vary during<br />

the various stages of operation outlined in section 4.<br />

01/09/2010 – v7 Page 6 of 40