Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
RAIL CORPORATION NEW SOUTH WALES<br />
ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />
MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />
Routes / Train Movements Controlled By<br />
Routes Entering the <strong>PPP</strong> Co. Yard Area<br />
via Access Road 1<br />
Routes Exiting the <strong>PPP</strong> Co. Yard Area via<br />
Access Road 1<br />
Routes Entering the Down Relief from the<br />
Down Suburban (via points B)<br />
Routes Entering / Exiting the Down Relief<br />
from the Down Suburban (via points C)<br />
Routes Entering / Exiting the <strong>PPP</strong> Co. Yard<br />
Area from the Commissioning Track via<br />
points “F” or “G”<br />
Routes Entering the Down Relief (Via 705<br />
crossover) from the <strong>RailCorp</strong> network<br />
Routes Exiting the Down Relief (Via 705<br />
crossover) to the <strong>RailCorp</strong> network<br />
.<br />
9.3.6.2 Stage 3<br />
ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />
• Co-ordinated <strong>PPP</strong> Co Yard<br />
and <strong>RailCorp</strong> control (when<br />
one or more Access Control<br />
Areas are under <strong>RailCorp</strong><br />
control)<br />
<strong>PPP</strong> Co. Yard Control<br />
• <strong>PPP</strong> Co. Yard Control (when<br />
Access Control Area 1 is under<br />
<strong>PPP</strong> Co. control)<br />
• Co-ordinated <strong>PPP</strong> Co Yard<br />
and <strong>RailCorp</strong> control (when<br />
Access Control Area 1 is under<br />
<strong>RailCorp</strong> control)<br />
<strong>RailCorp</strong> Granville Signal Box<br />
(requires <strong>RailCorp</strong> to have control of<br />
Access Control Area 1)<br />
<strong>RailCorp</strong> Granville Signal Box<br />
(requires <strong>RailCorp</strong> to have control of<br />
Access Control Area 1)<br />
<strong>PPP</strong> Co. Yard Control<br />
<strong>RailCorp</strong> Granville Signal Box<br />
(requires <strong>RailCorp</strong> to have control of<br />
Access Control Area 3)<br />
<strong>RailCorp</strong> Granville Signal Box must<br />
clear <strong>RailCorp</strong> signal 221 to allow the<br />
<strong>PPP</strong> Co. Signal on the Down Relief to<br />
clear (requires <strong>RailCorp</strong> to have<br />
control of Access Control Area 3)<br />
The control of the various train movements for Stage 3 (and associated signal routes) is<br />
shown below:<br />
Routes / Train Movements Controlled By<br />
Routes Entering / Exiting the <strong>PPP</strong> Yard<br />
Area from the Down Relief line (Auburn<br />
End)<br />
Dual Control - <strong>RailCorp</strong> / <strong>PPP</strong> Co.<br />
01/09/2010 – v7 Page 21 of 40