RAIL CORPORATION NEW SOUTH WALES<br />

11.3 CONTROL FOR THE ACCESS CONTROL AREAS.<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

The switching of control of each of the Access Control Areas between <strong>RailCorp</strong> and <strong>PPP</strong><br />

Co. must be done in a safe manner and with the agreement of both the <strong>PPP</strong> Co and<br />

<strong>RailCorp</strong> signallers..<br />

Three “Access Control” switches (or electronic equivalent) are to be provided on the <strong>PPP</strong><br />

Co Yard Controller’s panel, one switch for each Access Control Area. The switches will<br />

allow the control of each Access Control Area to be changed from <strong>RailCorp</strong> to <strong>PPP</strong> Co. or<br />

vice versa.<br />

To ensure that the control of the interfaces is not changed by the <strong>PPP</strong> Co. Yard controller<br />

without the agreement of the relevant <strong>RailCorp</strong> signaller, a Release/Accept arrangement is<br />

to be provided. The signalling system must not allow a change of control without both the<br />

<strong>PPP</strong> Co Yard Controller and the relevant <strong>RailCorp</strong> signaller agreeing to the change and<br />

operating an appropriate input to the system. This Dual control functionality must be<br />

provided in a manner that meets the operational requirements in a safe and robust way but<br />

also minimises the changes to the existing signalling systems at Auburn and Granville.<br />

Indications showing the status of who has control of each Access Control Area must be<br />

provided on the <strong>PPP</strong> Co Yard Controller’s panel and on the relevant <strong>RailCorp</strong> signallers<br />

panels at Auburn or Granville.<br />

Additional indications are to be provided for each Access Control Area to show<br />

• that the <strong>PPP</strong> Co. Yard Controller has requested the <strong>RailCorp</strong> signaller to accept a<br />

change in control of the interface, or vice versa<br />

• that the relevant <strong>RailCorp</strong> signaller has agreed to the change and released the<br />

“Access Switch” allowing the change in control to occur , or vice versa<br />

These additional indications are to be displayed to both the <strong>PPP</strong> Co. Yard Controller and<br />

the relevant <strong>RailCorp</strong> signaller.<br />

Change of control for each Access Control Area can only occur when safe for train<br />

movements and points and signals are in the appropriate safe state.<br />

11.4 ACCESS CONTROL SWITCH OPERATION – IMPACT ON TRAIN OPERATIONS<br />

The operation of the Access Switches for each Access Control Area will impact on the<br />

available train routes as follows;<br />

Access<br />

Access Control Set To<br />

Control<br />

Area <strong>RailCorp</strong> <strong>PPP</strong> Co.<br />

1<br />

<strong>Trains</strong> from Down Suburban can<br />

travel into Access Control Area 1<br />

(via “B” crossover) up to signal CT7<br />

<strong>Trains</strong> from Up Suburban can travel<br />

via Down Suburban (“D” crossover)<br />

<strong>Trains</strong> Can Not enter Access Control<br />

Area 1 from the Down Suburban<br />

<strong>Trains</strong> Can Not enter Access Control<br />

Area 1 from the Up Suburban<br />

01/09/2010 – v7 Page 31 of 40