RAIL CORPORATION NEW SOUTH WALES<br />

10 SIGNALLING SCOPE – <strong>PPP</strong> CO<br />

10.1 SCOPE OF WORK (TO BE UNDERTAKEN BY <strong>PPP</strong> CO)<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

Due to the volume of anticipated train movements throughout the area and the different<br />

parties involved it has been decided to provide a form of interlocked signalling throughout a<br />

large portion of the <strong>PPP</strong> Yard Area. A “Yard Controller” via a signalling control and<br />

indication system will control the signalled areas. The Yard Controller will also be<br />

responsible for train movements in the non-signalled areas of the yard.<br />

10.1.1 STAGES 1 & 2<br />

The <strong>PPP</strong> Co. scope of work for the <strong>PPP</strong> Yard Area associated with Stages 1&2 of the<br />

project is:<br />

• Assist <strong>RailCorp</strong> with the modification of the points layouts and associated signalling<br />

(<strong>RailCorp</strong> Area) leading to the <strong>PPP</strong> Co. Yard area at the Auburn end of the Down Relief<br />

• Provide interlocked shunt signals throughout the following sections of the <strong>PPP</strong> yard area<br />

as shown in blue on the signalling schematic drawings. In general it includes<br />

� Entrance and exit to arrival roads, departure roads, Access Road 1, Train Wash,<br />

Wheel Profile Road and Standing Roads West.<br />

� The Down Relief line along the section to be used as a Commissioning Track<br />

� Connections to MainTrain sidings from the By Pass Road 1<br />

� Connections to the Car Turning Loop<br />

• <strong>PPP</strong> Co. to provide the required interfaces (at interface locations at the extremities of<br />

the <strong>PPP</strong> Co. Yard area and at Clyburn Junction) for connecting to the Auburn and<br />

Granville signal boxes.<br />

10.1.2 STAGE 3<br />

The <strong>PPP</strong> Co. scope of work for the <strong>PPP</strong> Yard Area associated with Stage 3 of the project is:<br />

• Provide additional signalling on the Storage roads at the Auburn end of the Yard to<br />

convert them to Bi-directional Arrival / Departure / Storage Roads.<br />

• Provide enhanced interfaces (at interface locations at the extremities of the <strong>PPP</strong> Co.<br />

Yard area) for connecting to the Strathfield Signal Box.<br />

10.2 LINE SPEEDS<br />

The maximum line speeds are:<br />

Area Speed<br />

All lines throughout the <strong>PPP</strong> Yard Area 8 km/hr<br />

01/09/2010 – v7 Page 23 of 40