RAIL CORPORATION NEW SOUTH WALES<br />

9.3.4 ADDITIONAL SIGNALLING EQUIPMENT HOUSINGS<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

<strong>Double</strong> skinned stainless steel location cases, with flow through ventilation, are to be<br />

provided as required by the final design. The cases are to be designed and installed to<br />

ensure the heat control inside the cases is compatible with the requirements of the<br />

equipment installed within the cases, and to maintain internal temperatures at ambient.<br />

Note: The exact number required and their location will depend on the final design.<br />

9.3.5 ADDITIONAL SIGNALLING TELEPHONES<br />

Telephone requirements are shown in the table below:<br />

Location Telephone Requirements<br />

At Main Signals Telephone required<br />

At Points A telephone, located adjacent to the<br />

Emergency Operations Lock<br />

Note: The telephones to connect to the relevant <strong>RailCorp</strong> Signal Box (Auburn or Granville<br />

for Stages 1 & 2, and Strathfield for Stage 3)<br />

9.3.6 CONTROL OF SIGNAL ROUTES<br />

9.3.6.1 Stages 1 & 2<br />

The control of the various train movements for Stages 1 & 2 (and associated signal routes)<br />

is shown below:<br />

Routes / Train Movements Controlled By<br />

Routes Entering the <strong>PPP</strong> Yard Area (to the<br />

Arrival Roads 1 & 2 and By Pass Road 1)<br />

from the Down Relief line (Auburn End)<br />

Routes Exiting the <strong>PPP</strong> Yard Area (from<br />

Departure Roads 1-4) to the Down Relief<br />

line (Auburn End)<br />

Routes Entering / Exiting the Down Relief<br />

Access Control Area 2 Area from Auburn<br />

end of Down Relief (via 49 points)<br />

Train Movements along the Commissioning<br />

Track (section of Down Relief )<br />

<strong>RailCorp</strong> Auburn Signal Box<br />

<strong>RailCorp</strong> Auburn Signal Box must<br />

clear <strong>RailCorp</strong> signal 21D to allow the<br />

<strong>PPP</strong> Co. Departure road signals to<br />

clear<br />

<strong>RailCorp</strong> Auburn Signal Box (requires<br />

<strong>RailCorp</strong> to have control of Access<br />

Control Area 2)<br />

• <strong>PPP</strong> Co. Yard Control (when<br />

all Access Control Areas are<br />

under <strong>PPP</strong> Co. control)<br />

01/09/2010 – v7 Page 20 of 40