RAIL CORPORATION NEW SOUTH WALES<br />
9.3.4 ADDITIONAL SIGNALLING EQUIPMENT HOUSINGS<br />
ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />
MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />
ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />
<strong>Double</strong> skinned stainless steel location cases, with flow through ventilation, are to be<br />
provided as required by the final design. The cases are to be designed and installed to<br />
ensure the heat control inside the cases is compatible with the requirements of the<br />
equipment installed within the cases, and to maintain internal temperatures at ambient.<br />
Note: The exact number required and their location will depend on the final design.<br />
9.3.5 ADDITIONAL SIGNALLING TELEPHONES<br />
Telephone requirements are shown in the table below:<br />
Location Telephone Requirements<br />
At Main Signals Telephone required<br />
At Points A telephone, located adjacent to the<br />
Emergency Operations Lock<br />
Note: The telephones to connect to the relevant <strong>RailCorp</strong> Signal Box (Auburn or Granville<br />
for Stages 1 & 2, and Strathfield for Stage 3)<br />
9.3.6 CONTROL OF SIGNAL ROUTES<br />
9.3.6.1 Stages 1 & 2<br />
The control of the various train movements for Stages 1 & 2 (and associated signal routes)<br />
is shown below:<br />
Routes / Train Movements Controlled By<br />
Routes Entering the <strong>PPP</strong> Yard Area (to the<br />
Arrival Roads 1 & 2 and By Pass Road 1)<br />
from the Down Relief line (Auburn End)<br />
Routes Exiting the <strong>PPP</strong> Yard Area (from<br />
Departure Roads 1-4) to the Down Relief<br />
line (Auburn End)<br />
Routes Entering / Exiting the Down Relief<br />
Access Control Area 2 Area from Auburn<br />
end of Down Relief (via 49 points)<br />
Train Movements along the Commissioning<br />
Track (section of Down Relief )<br />
<strong>RailCorp</strong> Auburn Signal Box<br />
<strong>RailCorp</strong> Auburn Signal Box must<br />
clear <strong>RailCorp</strong> signal 21D to allow the<br />
<strong>PPP</strong> Co. Departure road signals to<br />
clear<br />
<strong>RailCorp</strong> Auburn Signal Box (requires<br />
<strong>RailCorp</strong> to have control of Access<br />
Control Area 2)<br />
• <strong>PPP</strong> Co. Yard Control (when<br />
all Access Control Areas are<br />
under <strong>PPP</strong> Co. control)<br />
01/09/2010 – v7 Page 20 of 40