Feasibility Investigation – Auburn Maintenance Facility – <strong>RailCorp</strong> Staff Facilities<br />
Design Discipline: Stormwater Drainage - Date 16/04/2010<br />
Component:<br />
Reference Drawings / Sketches:<br />
Concept Stormwater Layout 16/4/10<br />
Description of Works proposed:<br />
SP1 Existing Office Area ⌧ SP2 New External Facility �<br />
Stormwater drainage adjustments to existing carpark and new drainage for buildings and courtyard.<br />
Listing of proposed New Works Comment (if needed)<br />
1. Part removal of existing carpark drainage Refer to attached sketch<br />
2. Installation of new stormwater lines for adjusted carpark and Training<br />
Facility buildings.<br />
Connect into existing carpark drainage<br />
line near pit CP4 (Refer to attached<br />
sketch).<br />
3. Installation of proposed buildings downpipe drainage. No roof plans provided at this stage –<br />
indicative layout only (Refer to attached<br />
sketch).<br />
4. Installation of junction pits, gully pits and grated pits. Refer to attached sketch<br />
5. Grading of courtyard area to suit drainage pits.<br />
6. Installation of subsoil drainage to new garden areas.<br />
7. Stormwater connection to rainwater tank including first flush and overflows if<br />
required.<br />
Cont’d<br />
To be confirmed<br />
G:\<strong>PPP</strong> DELIVERY PHASE\COMMERCIAL CONTRACT\Contract Administration\Variations\RFTAs\TPS rewrite\<strong>Exhibit</strong>s 1.8 (draft<br />
- do not use)\<strong>Exhibit</strong> 7 - MFS v6\Attachment 8.7 - Training Stormwater datasheet 01.docHV-028 AMF <strong>RailCorp</strong> Staff Facilities<br />
Construction Requirements Summary Pg 1 of 2