RFTA<br />
00370<br />
RAIL CORPORATION NEW SOUTH WALES<br />
ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />
MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />
ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />
Area Speed<br />
Through all turnouts and crossovers in the <strong>PPP</strong> Yard Area 8 km/hr<br />
All lines across the Level Crossing 8 km/hr<br />
Train Testing on the Commissioning Track 25 km/hr<br />
Note: Higher speeds on the Commissioning Track may be acceptable subject to suitable<br />
operations procedures being developed by <strong>PPP</strong> Co. and approved by <strong>RailCorp</strong>.<br />
10.3 SIGNALLING REQUIREMENTS<br />
The Signalling and related Train Control and Communications requirements are covered in<br />
the following sections:<br />
10.3.1 SIGNALLING DESIGN CRITERIA<br />
The key signalling design criteria are:<br />
Train Length<br />
Design Criteria<br />
8 Car Suburban Set (Except as shown below)<br />
8 Car Inter-Urban “V” Set in the following areas:<br />
• Storage Road 5<br />
• Storage Road 6<br />
• Car Turning Loop (immediately after By Pass<br />
turnout)<br />
Overlaps (Emergency Braking) GE 52A (10m minimum)<br />
Braking Distance (Service Braking) GE 62<br />
10.3.2 SIGNALLING INTERLOCKING CONFIGURATION<br />
<strong>PPP</strong> Co. are to provide Microlok II interlockings to control the signalling within the <strong>PPP</strong> Yard<br />
Area<br />
All signalling within the <strong>PPP</strong> Yard Area is to be designed and installed as a separate system<br />
from the signalling systems on the adjacent <strong>RailCorp</strong> Network subject to the necessary<br />
integration required for the Access Control Areas. All train movements in the <strong>PPP</strong> Yard Area<br />
(and Access Control Areas when under the control of the <strong>PPP</strong> Co. Yard Controller) are to be<br />
independent of the <strong>RailCorp</strong> Signallers. Wherever possible, failures on the <strong>RailCorp</strong> system<br />
must not impact on operations within the <strong>PPP</strong> Yard Area, and vice versa.<br />
Microlok cardfiles are to be located at relevant signal locations with interconnection by<br />
duplicated single multi-mode fibre optic links.<br />
01/09/2010 – v7 Page 24 of 40