RFTA<br />

00370<br />

RAIL CORPORATION NEW SOUTH WALES<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

Area Speed<br />

Through all turnouts and crossovers in the <strong>PPP</strong> Yard Area 8 km/hr<br />

All lines across the Level Crossing 8 km/hr<br />

Train Testing on the Commissioning Track 25 km/hr<br />

Note: Higher speeds on the Commissioning Track may be acceptable subject to suitable<br />

operations procedures being developed by <strong>PPP</strong> Co. and approved by <strong>RailCorp</strong>.<br />

10.3 SIGNALLING REQUIREMENTS<br />

The Signalling and related Train Control and Communications requirements are covered in<br />

the following sections:<br />

10.3.1 SIGNALLING DESIGN CRITERIA<br />

The key signalling design criteria are:<br />

Train Length<br />

Design Criteria<br />

8 Car Suburban Set (Except as shown below)<br />

8 Car Inter-Urban “V” Set in the following areas:<br />

• Storage Road 5<br />

• Storage Road 6<br />

• Car Turning Loop (immediately after By Pass<br />

turnout)<br />

Overlaps (Emergency Braking) GE 52A (10m minimum)<br />

Braking Distance (Service Braking) GE 62<br />

10.3.2 SIGNALLING INTERLOCKING CONFIGURATION<br />

<strong>PPP</strong> Co. are to provide Microlok II interlockings to control the signalling within the <strong>PPP</strong> Yard<br />

Area<br />

All signalling within the <strong>PPP</strong> Yard Area is to be designed and installed as a separate system<br />

from the signalling systems on the adjacent <strong>RailCorp</strong> Network subject to the necessary<br />

integration required for the Access Control Areas. All train movements in the <strong>PPP</strong> Yard Area<br />

(and Access Control Areas when under the control of the <strong>PPP</strong> Co. Yard Controller) are to be<br />

independent of the <strong>RailCorp</strong> Signallers. Wherever possible, failures on the <strong>RailCorp</strong> system<br />

must not impact on operations within the <strong>PPP</strong> Yard Area, and vice versa.<br />

Microlok cardfiles are to be located at relevant signal locations with interconnection by<br />

duplicated single multi-mode fibre optic links.<br />

01/09/2010 – v7 Page 24 of 40