Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Feasibility Investigation – Auburn Maintenance Facility – <strong>RailCorp</strong> Staff Facilities<br />
Construction Requirements Summary - Concept<br />
Design Discipline: Architectural Services Date 14/04/2010<br />
Component:<br />
Reference Drawings / Sketches: A-003B<br />
Description of Works proposed:<br />
SP1 Existing Office Area ⌧ SP2 New External Facility �<br />
Provide temporary external buildings for AMF Railcorp Training Facilities<br />
Listing of proposed New Works Comment (if needed)<br />
1. Common Area Facilities<br />
Common Facility Room<br />
Portable Buildings<br />
Model : Complex 12m x 12m<br />
Code: 864220<br />
Area 139m 2<br />
Floor Finish Non slip Vinyl<br />
8 New Tables<br />
70 New Chairs<br />
Kitchen<br />
Reception, Lounge, Storage, Filing & IT / Comms Room<br />
Portable Buildings<br />
Part of Classroom Model : Classrooms 28.2m x 7.2m<br />
Code: 864150<br />
Area 62m 2<br />
Floor Finish Carpet, Anti Static to IT / Comms Room<br />
3 New Lounge Chairs<br />
1 New Coffee Table<br />
2 New Side Tables<br />
3 Copier / Printer<br />
1 Fax<br />
6 Filing Cabinets<br />
IT & COMP Room<br />
Portable Buildings<br />
Model : Offices 6m x 3m<br />
Note<br />
Portable Building Model Classrooms 28.2m x<br />
7.2m, Code 864150 is a 3 room unit model.<br />
Window Bars to all windows.<br />
Photo Copier Size needs to be confirmed.<br />
Notice Boards, White boards and audiovisual<br />
has not been included.<br />
Portable Building supplier to supply air<br />
conditioning units to their building pods.<br />
HV-028 AMF <strong>RailCorp</strong> Staff Facilities Construction Requirements Summary Pg 1 of 6