RAIL CORPORATION NEW SOUTH WALES<br />
7 SIGNALLING AREAS<br />
ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />
MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />
ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />
The new <strong>PPP</strong> Co Maintenance Facilities and adjoining yards connect onto the <strong>RailCorp</strong><br />
network. As well as the new infrastructure and related signalling required to service the new<br />
yard layout associated with the Maintenance Facility some infrastructure and signalling<br />
changes are also required to the adjoining <strong>RailCorp</strong> network.<br />
Therefore there are three distinct areas as follows:<br />
• <strong>RailCorp</strong> network area<br />
• <strong>PPP</strong> Co. Yard area<br />
• Dual Access Control Areas<br />
The three areas are shown in different colours on the Signalling Schematic Concept Design<br />
drawings.<br />
Due to the different operational requirements within the three discreet areas there are<br />
different signalling requirements for each area.<br />
This functional specification details the specific signalling requirements of these areas, as<br />
follows:<br />
• General Signalling requirements common to all three areas are covered in section 8<br />
• <strong>RailCorp</strong> Network area requirements are covered in section 9<br />
• <strong>PPP</strong> Co. Yard area requirements are covered in section 10<br />
• Access Control Area requirements are covered in section 11<br />