16.12.2012 Views

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rail Corporation New South Wales<br />

<strong>Rolling</strong> <strong>Stock</strong> <strong>PPP</strong> – <strong>Double</strong> <strong>Deck</strong> <strong>Trains</strong><br />

Maintenance Facility Works Specification<br />

<strong>Exhibit</strong> 7 - MFS v7.doc<br />

on the Cars and the heaviest roof-mounted component of the existing <strong>RailCorp</strong><br />

electric fleet (2.5 tonnes) plus associated lifting frames, slings, etc. The cranes<br />

shall be interlocked in respect of location and the Overhead Traction Power<br />

System;<br />

(h) Maintenance Roads grades shall be designed such that rolling stock will not roll<br />

due to gravity;<br />

(i) elevated platforms shall be provided on both sides of each Maintenance Road<br />

for access to car equipment mounted at roof level. The design of these<br />

platforms must allow for removal and fitting of window glass. Adequate fall<br />

protection is to be provided in accordance with occupational health and safety<br />

laws;<br />

(j) access to elevated platforms shall be by fold-up stairs interlocked to prevent<br />

access whilst the Overhead Traction Power System is operational;<br />

(k) supply from the Overhead Traction Power System shall be provided to each<br />

Maintenance Road, with interlocking system and ‘swing away’ mounting of the<br />

Overhead Wire;<br />

(l) ‘Shore’ Supply 415 Volt, 3 phase 50 Hz AC power supply shall be provided to<br />

each Maintenance Road with outlets at regular intervals for the test operation of<br />

Car equipment;<br />

(m) 415 Volt, 3 phase 50 Hz power outlets shall be provided on both sides of each<br />

Maintenance Road for the operation of portable power tools and welders along<br />

the full length of each Maintenance Road;<br />

(n) 240 Volt, single phase power outlets shall be provided on both sides of each<br />

Maintenance Road at regular intervals for the operation of portable power tools<br />

and lights along the full length of each Maintenance Road;<br />

(o) access must be provided on all Maintenance Roads to enable presentation<br />

personnel to safely and efficiently access the sets for all cleaning work-<br />

including Major Cleans, Daily Cleans and Turnaround Cleans;<br />

(p) water supply points shall be provided on both sides of each Maintenance Road<br />

for cleaning operations along the full length of each Maintenance Road; and<br />

(q) reticulated general service compressed air supply is to be provided with ‘Quick<br />

Connect’ outlets on both sides of each Maintenance Road for the operation of<br />

pneumatic tools along the full length of each Maintenance Road.<br />

4.1.3 Underfloor Wheel Profiling Plant Building<br />

<strong>PPP</strong> Co must provide the Underfloor Wheel Profiling Plant Building to enclose the<br />

Underfloor Wheel Profiling Plant and associated equipment and facilities. As a minimum,<br />

the <strong>PPP</strong> Co design of the Underfloor Wheel Profiling Plant Building must incorporate the<br />

same features stipulated above for the Maintenance Building that are relevant to the<br />

Underfloor Wheel Profiling Plant’s physical and operational environments.<br />

v7 – 17/01/2011 Page 27 of 51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!