RAIL CORPORATION NEW SOUTH WALES<br />
8 SIGNALLING - GENERAL REQUIREMENTS<br />
8.1 CONCEPT SIGNALLING SCHEMATIC<br />
ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />
MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />
ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />
Concept Signalling Schematics have been developed for the new facility and its interfaces<br />
with the <strong>RailCorp</strong> Down Relief Line. The concept schematics have been prepared as a<br />
guide to the level of signalling required for estimating and project planning purposes.<br />
The final number, positioning and form of signals will be determined by:<br />
• A review of the final operational requirements – especially across the interfaces with the<br />
<strong>RailCorp</strong> network.<br />
• A Risk assessment<br />
The Concept Signalling requirements showing the Control Areas for each of the stages are<br />
shown on the following A3 drawings:<br />
Stages 1 & 2 – Control Areas SG0405297 (Sheet 1) To SG0405303 (Sheet 7)<br />
Stages 3 – Control Areas SG0405304 (Sheet 1) To SG0405310 (Sheet 7)<br />
Copies of these drawings are included as Attachments 1 & 2 respectively<br />
8.2 DESIGN STANDARDS FOR SIGNALLING AND RELATED SYSTEMS<br />
The signalling, train control and related communications systems design must comply with<br />
all current relevant <strong>RailCorp</strong> design standards.<br />
Details of the latest versions of the standards can be obtained from the <strong>RailCorp</strong> website.<br />
Where there is no specific <strong>RailCorp</strong> standard the relevant Australian standards apply.<br />
8.3 ELECTRICAL PROTECTION<br />
The signalling, control and communications systems must be protected from any<br />
interference from other electrical power distribution systems, including the <strong>RailCorp</strong> 1500v<br />
DC Traction supply system.<br />
The systems must also be protected from lightning and other electrical surges in<br />
accordance with the <strong>RailCorp</strong> standards.<br />
Note: This site is particularly susceptible to lightning strikes.<br />