Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
RAIL CORPORATION NEW SOUTH WALES<br />
ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />
MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />
ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />
Item Comment<br />
Routing information Signal routes set<br />
Signals Signal status. Cleared or at stop<br />
Points Points position (Normal / reverse) and status<br />
(locked / free)<br />
Dual Access Control Switches Access Control Status – <strong>PPP</strong> Co. or <strong>RailCorp</strong><br />
(Defining Auburn or Granville Signal Box)<br />
Releasing Switches Status<br />
Power Supplies Status<br />
Note: Multiple switchable display layouts must be provided with the ability to select the level<br />
of information displayed at any one time so as minimise “clutter” on the displays. Display of<br />
information “by exception” to be provided wherever practical.<br />
Indications of Approaching <strong>Trains</strong><br />
Indications of train movements approaching the <strong>PPP</strong> Co. controlled Yard areas from the<br />
<strong>RailCorp</strong> network are to be displayed on the new <strong>PPP</strong> Co. control system. The indications<br />
must extend back far enough to ensure adequate warning of trains approaching the various<br />
<strong>RailCorp</strong> / <strong>PPP</strong> Co. Area interfaces to enable the Yard Controller to set routes and not<br />
cause delays to the train services exiting the <strong>RailCorp</strong> network.<br />
Indications of <strong>PPP</strong> Yard to be displayed in <strong>RailCorp</strong>’s Signal Boxes<br />
<strong>PPP</strong> Co is to procure, test and commission a LCD monitor that displays track occupancy for<br />
the Yard for subsequent installation into Auburn and Granville Boxes by <strong>RailCorp</strong>. This<br />
display is to show the relevant signal, track, and point indications that are available to the<br />
<strong>PPP</strong> Co. Yard Controller.<br />
01/09/2010 – v7 Page 29 of 40