Rail Corporation New South Wales<br />

2 SCOPE – GENERAL<br />

<strong>Rolling</strong> <strong>Stock</strong> <strong>PPP</strong> – <strong>Double</strong> <strong>Deck</strong> <strong>Trains</strong><br />

Maintenance Facility Works Specification<br />

<strong>Exhibit</strong> 7 - MFS v7.doc<br />

The scope of work for <strong>PPP</strong> Co in respect of the Maintenance Facility Works includes but is not<br />

limited to the following:<br />

(a) obtain all Approvals other than the Planning Approval (but subject to clauses 7.3 and 7.4 of<br />

the Conditions of Contract);<br />

(b) carry out any necessary investigations and searches;<br />

(c) carry out all required design;<br />

(d) prepare all required Design Documentation; and<br />

(e) undertake all construction, testing and commissioning.<br />

Without limiting any other provision of the Contract in respect of <strong>PPP</strong> Co’s design or safety<br />

obligations (including clause 4.6.2 of the Contract Management Requirements), <strong>PPP</strong> Co must<br />

ensure that the safeworking requirements for access to the suburban and main lines (including<br />

emergency access during the Delivery Phase) can be achieved with the <strong>PPP</strong> Co design and<br />

<strong>RailCorp</strong> may reject <strong>PPP</strong> Co’s design if this requirement is not satisfied.<br />