Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Rail Corporation New South Wales<br />
2 SCOPE – GENERAL<br />
<strong>Rolling</strong> <strong>Stock</strong> <strong>PPP</strong> – <strong>Double</strong> <strong>Deck</strong> <strong>Trains</strong><br />
Maintenance Facility Works Specification<br />
<strong>Exhibit</strong> 7 - MFS v7.doc<br />
The scope of work for <strong>PPP</strong> Co in respect of the Maintenance Facility Works includes but is not<br />
limited to the following:<br />
(a) obtain all Approvals other than the Planning Approval (but subject to clauses 7.3 and 7.4 of<br />
the Conditions of Contract);<br />
(b) carry out any necessary investigations and searches;<br />
(c) carry out all required design;<br />
(d) prepare all required Design Documentation; and<br />
(e) undertake all construction, testing and commissioning.<br />
Without limiting any other provision of the Contract in respect of <strong>PPP</strong> Co’s design or safety<br />
obligations (including clause 4.6.2 of the Contract Management Requirements), <strong>PPP</strong> Co must<br />
ensure that the safeworking requirements for access to the suburban and main lines (including<br />
emergency access during the Delivery Phase) can be achieved with the <strong>PPP</strong> Co design and<br />
<strong>RailCorp</strong> may reject <strong>PPP</strong> Co’s design if this requirement is not satisfied.<br />
v7 – 17/01/2011 Page 7 of 51