Rail Corporation New South Wales<br />
Issue Date Author Change<br />
v6 31/08/2010 ARJS Addition of text changes from RFTA:<br />
Notes:<br />
<strong>Rolling</strong> <strong>Stock</strong> <strong>PPP</strong> – <strong>Double</strong> <strong>Deck</strong> <strong>Trains</strong><br />
Maintenance Facility Works Specification<br />
00339 00356 00358<br />
00374 00369 00370<br />
<strong>Exhibit</strong> 7 - MFS v7.doc<br />
RFTA 00339 amends Attachments 6 & 7. For attachment 6,<br />
Drawings SG 0405297 to 0405324 are amended as follows:<br />
NOTES: 8. All shunt signals to be post mounted unless<br />
otherwise agreed by <strong>RailCorp</strong>.<br />
RFTA 00358 relies on external documents, now included as<br />
Attachments 8.1 to 8.7.<br />
RFTA 00374 amends Attachment 7.<br />
RFTA 00365 amends the Maintenance Facility Design Book,<br />
Requirement ID MFDB.1813 Underfloor Wheel Profiling Plant<br />
Building.52.<br />
RFTA 00369 also amends the Maintenance Facility Design Book,<br />
Requirement IDs MFDB.742 Signalling and Yard Control.54 &<br />
MFDB.762 Signalling and Yard Control.74.<br />
v7 17/01/2011 ARJS No changes to document body of <strong>RailCorp</strong> Maintenance Facility<br />
Specification, however:<br />
RFTA 00377 amends the Maintenance Facility Design Book,<br />
Clause 4.1.1.20 Building Services: Power Electrical Services –<br />
Power Supply (pp177-178).<br />
RFTA 00379 amends the Maintenance Facility Design Book,<br />
Section 3.1.2 (pp68-69) and Section (4.1.1.20 pp177).<br />
v7 – 17/01/2011 Page 3 of 51