RAIL CORPORATION NEW SOUTH WALES<br />
1 INTRODUCTION<br />
ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />
MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />
ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />
The <strong>Rolling</strong> <strong>Stock</strong> Public Private Partnership (<strong>PPP</strong>) Project incorporates the design,<br />
construction, maintenance and finance of new passenger rail cars to replace existing R, S &<br />
L rolling stock and associated maintenance facilities for the rail cars. The maintenance site<br />
for this project is located between Auburn and Clyde stations on the southern side of the<br />
western Main Line. The <strong>PPP</strong> Co. will operate the facility for approximately 35 years before it<br />
is handed back to <strong>RailCorp</strong>.<br />
The capacity of the <strong>PPP</strong> Maintenance Facility is to maintain a fleet of 1000 cars comprising<br />
the <strong>PPP</strong> Sets and, Other Sets (that include sets that <strong>RailCorp</strong> agrees to be maintained at<br />
the Maintenance Facility).<br />
This facility will have a number of storage and maintenance sidings with connections to the<br />
<strong>RailCorp</strong> network via the Down Relief currently being upgraded. The facility will also share<br />
access to the Down Relief with MainTrain, Presentation Services and the Manildra flour<br />
store.<br />
Note: This document also refers to a Future <strong>RailCorp</strong> Facility adjacent to the <strong>PPP</strong><br />
Maintenance Facility. Based on preliminary planning for the site it is expected that this<br />
facility will be a Stabling Yard, however no decision has been made at this time.<br />
This functional specification outlines the key signalling requirements for the new <strong>PPP</strong><br />
Maintenance Facility, and it’s interfaces with the existing <strong>RailCorp</strong> network including the<br />
Down Relief.<br />
01/09/2010 – v7 Page 4 of 40