16.12.2012 Views

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RAIL CORPORATION NEW SOUTH WALES<br />

1 INTRODUCTION<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

The <strong>Rolling</strong> <strong>Stock</strong> Public Private Partnership (<strong>PPP</strong>) Project incorporates the design,<br />

construction, maintenance and finance of new passenger rail cars to replace existing R, S &<br />

L rolling stock and associated maintenance facilities for the rail cars. The maintenance site<br />

for this project is located between Auburn and Clyde stations on the southern side of the<br />

western Main Line. The <strong>PPP</strong> Co. will operate the facility for approximately 35 years before it<br />

is handed back to <strong>RailCorp</strong>.<br />

The capacity of the <strong>PPP</strong> Maintenance Facility is to maintain a fleet of 1000 cars comprising<br />

the <strong>PPP</strong> Sets and, Other Sets (that include sets that <strong>RailCorp</strong> agrees to be maintained at<br />

the Maintenance Facility).<br />

This facility will have a number of storage and maintenance sidings with connections to the<br />

<strong>RailCorp</strong> network via the Down Relief currently being upgraded. The facility will also share<br />

access to the Down Relief with MainTrain, Presentation Services and the Manildra flour<br />

store.<br />

Note: This document also refers to a Future <strong>RailCorp</strong> Facility adjacent to the <strong>PPP</strong><br />

Maintenance Facility. Based on preliminary planning for the site it is expected that this<br />

facility will be a Stabling Yard, however no decision has been made at this time.<br />

This functional specification outlines the key signalling requirements for the new <strong>PPP</strong><br />

Maintenance Facility, and it’s interfaces with the existing <strong>RailCorp</strong> network including the<br />

Down Relief.<br />

01/09/2010 – v7 Page 4 of 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!