Listing of proposed Works (Part 2 – New Works) Comment (if needed)<br />

1. Provide a 160A 400V/3phase/50Hz power supply to the AMF Railcorp Staff<br />

Facilities (drawing A-003 B). This electrical demand has been estimated<br />

based on the assumptions listed below.<br />

Small power design to include power densities as follows:<br />

- 30W/m2 to workstation/training areas<br />

- 20W/m2 to meeting rooms, kitchen and tea rooms<br />

- 5W/m2 to other areas including corridors<br />

- 40W/m2 to A/C areas (split A/C)<br />

- IT rooms at 10kW each<br />

- 10% for hydraulic and fire services.<br />

- 20% spare capacity.<br />

2. Hot water heaters to comprise instantaneous electrical water heaters to<br />

amenities and kitchen plus a HWU/CWU to the kitchen. Diversities to<br />

AS3000.<br />

3. HVAC design based on split type wall mounted AC units. Ventilation to<br />

general area utilizing opening windows. Assumes all insulation and glazing<br />

to BCA requirements. Diversities to AS3000.<br />

HVAC not provided in corridor spaces.<br />

4. Lighting design to include fluorescent lighting to a power density of not more<br />

than BCA Section J allowances.<br />

5. Kitchen equipment to include:<br />

- two microwaves<br />

- toaster<br />

- sandwich maker<br />

- coffee maker<br />

- fridge<br />

6. An electrical cupboard is required to house meter panel and distribution<br />

board. Recommended cupboard space is 1600x500x2400mm (LxWxH).<br />

The cupboard should be outside located near the female locker room close<br />

to the substation.<br />

Indicative duration estimate for design component:<br />

Indicative duration estimate for construction component:<br />

Days:<br />

Days:<br />

This Construction Requirements Summary is intended as a high-level Concept stage output to provide<br />

relevant information for use of the Client for the purpose of which it has been prepared, defined under<br />

the Client’s Scope documentation and Halcrow / Aurecon undertakes no duty to or accepts any<br />

responsibility to any third party who may rely upon this document.<br />