16.12.2012 Views

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RAIL CORPORATION NEW SOUTH WALES<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

Routes / Train Movements Controlled By<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

Train Movements along the Down Relief <strong>RailCorp</strong> – Strathfield Signal Box<br />

Train movements through Clyburn Junction <strong>RailCorp</strong> – Strathfield Signal Box<br />

Routes Entering / Exiting the <strong>PPP</strong> Co. Yard<br />

Area via Access Road 1 (from midpoint of<br />

Down Relief line)<br />

Routes Entering / Exiting the <strong>PPP</strong> Co. Yard<br />

Area from the Down Relief via the Western<br />

most turnouts<br />

Routes Entering / Exiting the Down Relief<br />

(Via 705 crossover) from the <strong>RailCorp</strong><br />

network<br />

Dual Control - <strong>RailCorp</strong> / <strong>PPP</strong> Co.<br />

Dual Control - <strong>RailCorp</strong> / <strong>PPP</strong> Co.<br />

<strong>RailCorp</strong> – Strathfield Signal Box<br />

01/09/2010 – v7 Page 22 of 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!