Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
Rolling Stock PPP Double Deck Trains Exhibit 7 RailCorp ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
RAIL CORPORATION NEW SOUTH WALES<br />
ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />
MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />
Routes / Train Movements Controlled By<br />
ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />
Train Movements along the Down Relief <strong>RailCorp</strong> – Strathfield Signal Box<br />
Train movements through Clyburn Junction <strong>RailCorp</strong> – Strathfield Signal Box<br />
Routes Entering / Exiting the <strong>PPP</strong> Co. Yard<br />
Area via Access Road 1 (from midpoint of<br />
Down Relief line)<br />
Routes Entering / Exiting the <strong>PPP</strong> Co. Yard<br />
Area from the Down Relief via the Western<br />
most turnouts<br />
Routes Entering / Exiting the Down Relief<br />
(Via 705 crossover) from the <strong>RailCorp</strong><br />
network<br />
Dual Control - <strong>RailCorp</strong> / <strong>PPP</strong> Co.<br />
Dual Control - <strong>RailCorp</strong> / <strong>PPP</strong> Co.<br />
<strong>RailCorp</strong> – Strathfield Signal Box<br />
01/09/2010 – v7 Page 22 of 40