RAIL CORPORATION NEW SOUTH WALES<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

Crossover / Turnout Speed<br />

Down Relief to Down Suburban at Clyburn Junction 25 km/hr<br />

Note: Higher speeds on the Commissioning Track may be acceptable subject to suitable<br />

operations procedures being developed by <strong>PPP</strong> Co. and approved by <strong>RailCorp</strong>.<br />

9.3 SIGNALLING REQUIREMENTS<br />

9.3.1 SIGNALLING DESIGN CRITERIA<br />

The key signalling design criteria are:<br />

Design Criteria<br />

Overlaps (Emergency Braking) GE 52A<br />

Braking Distance (Service Braking) GW 16 (See Note below)<br />

GE 62 in the non-Freight Yard<br />

Signal Aspects • Generally 4 Aspect Signalling<br />

• With additional Low speed, shunt<br />

indications where required<br />

• Shunt Signals<br />

Note: Normal boards are to be provided to suit GW40 braked trains.<br />

9.3.2 SIGNALLING INTERLOCKINGS<br />

9.3.2.1 Stages 1 & 2<br />

The new <strong>PPP</strong> Co. Signalling system will need to interface with the existing Relay<br />

Interlocking at Auburn and SSI Interlocking at Granville as noted on the attached control<br />

area drawings (see attachment 1).<br />

Due to the age and condition of the Auburn interlocking and signal box control panel the<br />

changes have been kept to an absolute minimum. Alterations to the signalling for the<br />

modified track layout connecting to the <strong>PPP</strong> Co. Yard areas have been designed to allow<br />

the reuse of existing control panel switches.<br />

In addition the signalling layout has been designed to eliminate / minimise changes to the<br />

Granville interlocking and associated control system.<br />

Note: The Access Control Areas must be designed to ensure minimum changes to the<br />

<strong>RailCorp</strong> signalling systems at both Auburn and Granville.<br />