Rail Corporation New South Wales<br />
<strong>Rolling</strong> <strong>Stock</strong> <strong>PPP</strong> – <strong>Double</strong> <strong>Deck</strong> <strong>Trains</strong><br />
Maintenance Facility Works Specification<br />
<strong>Exhibit</strong> 7 - MFS v7.doc<br />
The design of the Site Trackwork must be consistent with the Track Schematic and include<br />
the catchpoints indicated. <strong>PPP</strong> Co must ensure that its design for the Site Trackwork<br />
caters for all operating conditions. .<br />
<strong>PPP</strong> Co will be required to work with <strong>RailCorp</strong> to ensure that a clear throw off area or other<br />
appropriate mitigation measures are adopted to minimise the damage to the Set and the<br />
surrounding infrastructure. The Site Trackwork includes turnouts and any components<br />
related to the interface with signalling equipment. <strong>PPP</strong> Co is to install the turnouts and<br />
supply and install any components related to the interface with signalling equipment on the<br />
Down Relief line shown on the Auburn Masterplan that provide access to the Maintenance<br />
Site. <strong>RailCorp</strong> will supply three (3) tangential turnouts with associated points motors,<br />
connecting rods, etc ‘free-supply’ to <strong>PPP</strong> Co for the connection to the Down Relief line.<br />
The design of the Site Trackwork must incorporate suitable and clearly signposted<br />
Handover Points and Pick-up Points denoting where Crews are expected to pick-up or<br />
leave Sets and Other Sets respectively.<br />
The minimum design standards for the Site Trackwork are as follows:<br />
(j) 53 kg/m rail on medium duty concrete sleepers laid over 150 mm of standard<br />
ballast and an appropriately engineered formation capping layer;<br />
(k) recycled 53 kg/m rail for plain track and recycled turnouts may be used,<br />
provided the recycled materials are in good condition and suitable for the<br />
Design Life of the Maintenance Facility;<br />
(l) subject to paragraphs (a) and (b), requirements for Class 1 Sidings and<br />
<strong>RailCorp</strong> Standard TS 3101 – Standard Classification of Lines; and<br />
(m) the Site Earthworks (including formation, etc) are to be constructed to <strong>RailCorp</strong><br />
standards, in particular TS 3421 – General Standards for Formation and<br />
Earthworks, and TS 3422 – Standard for Formation Capping Material.<br />
The Site Trackwork must incorporate the following design features:<br />
(a) centre distance between roads must be in accordance with the Design<br />
Guidelines for the Upgrade and Construction of New and Existing Train Stabling<br />
Yards and Turnback Sidings and any other relevant standards as set-out in<br />
Attachment 3; where there is a conflict between the centre distance between<br />
roads proposed by <strong>PPP</strong> Co and the relevant Standard, during the detailed<br />
design stage <strong>PPP</strong> Co will work with <strong>RailCorp</strong> to resolve this conflict to the<br />
satisfaction of <strong>RailCorp</strong>.<br />
(b) each road to be at least of sufficient length to accommodate 8-car sets<br />
measuring 163 m long (unless noted otherwise in clause 3.1.4) plus clearances<br />
for signalling, catchpoints and any other operational requirements including<br />
access for Crew to prevent fouling points where required;<br />
(c) entry or exit from the Storage Roads must not require the Sets, or the Other<br />
Sets to travel via the Maintenance Roads;<br />
v7 – 17/01/2011 Page 11 of 51