RAIL CORPORATION NEW SOUTH WALES<br />

13 STAGEWORK<br />

ROLLING STOCK <strong>PPP</strong> – DOUBLE DECK TRAINS<br />

MAINTENANCE FACILITY SPECIFICATION - ATTACHMENT 7<br />

ATTACHMENT 7 - SIGNAL FUNCTIONAL SPEC V7.DOC<br />

<strong>PPP</strong> Co. will be required to undertake stageworks impacting on the existing <strong>RailCorp</strong><br />

signalling system to accommodate the various construction activities associated with the<br />

<strong>PPP</strong> Co. Yard works.<br />

Staging works to be undertaken by <strong>PPP</strong> Co. include:<br />

• Removal and / or relocation of existing <strong>RailCorp</strong> signalling equipment, cables and cable<br />

routes and provision / utilisation of some of the new signalling components, including<br />

signals, point machines and cable routes /ULX’s.<br />

• Adjustment and / or reconfiguration of existing track circuits and track bonding and<br />

utilisation of new ULX’s, cable routes utilisation of some of the new signalling<br />

components, especially cable routes. ULX’s and bonding<br />

<strong>PPP</strong> Co. must design and implement the stageworks to minimise:<br />

• The impact on the existing <strong>RailCorp</strong> signalling system.<br />

• The impact on train services, especially <strong>RailCorp</strong> services.<br />

• The work required for commissioning of the new signalling system.<br />

01/09/2010 – v7 Page 34 of 40