You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Fnshd Prod. Order Rtng Cmt.<br />
Ln.<br />
B.1 Codeunit 104048, <strong>Upgrade</strong> 4.00 Step 2<br />
Transferred from table Transferred to table Description<br />
Fnshd Prod. Order BOM Cmt.<br />
Line<br />
Prod. Order Rtng Comment<br />
Line<br />
Prod. Order BOM Comment<br />
Line<br />
Posted Prod. Doc. Dimension Production Document<br />
Dimension<br />
Status set to Finished<br />
Status set to Finished<br />
Status set to Finished<br />
Fnshd Prod. Order Ledg. Entry Prod. Order Ledger Entry It will also move the<br />
corresponding associated<br />
dimensions.<br />
· Transfers all table data from the Prod. Order Ledger table using the following<br />
criteria:<br />
All production order ledger entries of type Consumption will update the following<br />
related item ledger entry fields:<br />
Field Name<br />
Prod. Order No.<br />
Prod. Order Line No.<br />
Prod. Order Comp Line No.<br />
All production order ledger entries of type Input/Output to do with output will have<br />
the following related item ledger entry fields updated:<br />
Field Name<br />
Prod. Order No.<br />
Prod. Order Line No.<br />
All production order ledger entries of type Input/Output representing capacity will:<br />
- insert capacity ledger entries with corresponding value entries (for direct cost and<br />
indirect cost) and their associated dimensions.<br />
- insert value entries (one direct cost entry and the other a variance entry) that were<br />
posted earlier as Purchase Variance to Subcontracted Variance related to the<br />
output item.<br />
· Transfers table data from the Temp. Prod. Order Rtng Line table to the following<br />
fields in the Prod. Order Routing Line table:<br />
Field ID Field Name<br />
90 Expected Operation Cost Amt.<br />
91 Expected Capacity Need<br />
96 Expected Capacity Ovhd Cost<br />
107