design elements - San Jacinto Texas Historic District
design elements - San Jacinto Texas Historic District
design elements - San Jacinto Texas Historic District
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SITE FURNISHINGS<br />
Waste Receptacle<br />
■ Waste receptacle style should match bench style where applicable.<br />
■ Receptacles should be capable of holding 22 or 32 gallon liners.<br />
■ Separate receptacles should be <strong>design</strong>ated for recyclable waste.<br />
■ Covers should be provided where a large proportion of food waste is<br />
expected.<br />
■ Receptacles should be surface mounted to the pavement.<br />
Recommended Manufacturer/Model<br />
■ Landscape Forms / Plainwell<br />
■ Estimated Installed Cost: $800 (c.2010)<br />
70 │ DESIGN ELEMENTS<br />
Bus Shelter<br />
■ Round, tubular steel column and barrel vault canopy construction.<br />
Column supports shall match the fl uting and base supports of the <strong>District</strong><br />
light poles. A decorative canopy frame support shall be constructed of<br />
steel with arches that refl ect the roof <strong>design</strong>. The metal roof shall be of<br />
standing seam construction with a wood roof deck facing the interior.<br />
■ Finish: All metal components shall have a minimum two-coat powder<br />
coat fi nish.<br />
■ Color: Posts and rails to be black, roof to be patina green.<br />
■ Comments: Consult manufacturer or structural engineer for footing<br />
<strong>design</strong>. Wind loading should take into account potential for hurricanes.<br />
Incorporate custom <strong>San</strong> <strong>Jacinto</strong> emblem into either end of roof support.<br />
Recommended Manufacturer/Model<br />
■ Poligon / Barrel vaulted Walkway Cover<br />
■ Estimated Installed Cost: $35,000 (c.2010)