01.03.2013 Views

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Affected Environment and <strong>Environmental</strong> Impacts October 2005<br />

Table 4-9. NRHP Eligibility Recommendations of Recorded Sites<br />

ASM Site # Description<br />

Eligible to<br />

NRHP? (Y/N)<br />

Eligibility Criterion<br />

AZ AA:2:118 SR 84 Y D<br />

AZ AA:12:226 Hohokam Pottery Y D<br />

AZ AA:12:227 Possible Hohokam Pit<br />

House Village<br />

Y D<br />

AZ AA:12:350 Adobe House Y D<br />

AZ AA:12:912 Pottery/Stone Scatter N N/A<br />

AZ AA:12:952 Red Rock Road Y D<br />

AZ AA:12:955 Concrete Weir Y D<br />

AZ AA:12:956 Historic Trash Scatter N N/A<br />

AZ AA:12:957 CMID Canal N N/A<br />

AZ EE:3:53 UPRR Y A<br />

None assigned Juan Bautista de Anza<br />

National Historic Trail<br />

Y Congressional<br />

Designation as<br />

National Historic Trail<br />

None assigned Isolated Occurrences N N/A<br />

None assigned Western Meat Packing<br />

building<br />

Effects of Eligible Resources<br />

No Build Alternative<br />

N N/A<br />

The no build alternative would have no impacts to archeological and cultural<br />

resources in the project area.<br />

Preferred Alternative<br />

The preferred alignment would avoid all but 5 of the 16 cultural resources<br />

identified within the project area. Prior archaeological excavation or development<br />

destroyed two other sites; therefore, they warrant no further consideration. Three<br />

other sites were considered ineligible for the National Register and no treatment<br />

was proposed for those sites. The Pascua Yaqui cemetery was more than 0.25 mile<br />

from any ground disturbance that would result from construction of the preferred<br />

alternative. Because of the proximity of I-<strong>10</strong>, the preferred alternative would not<br />

produce noise or visual impacts that would adversely affect the historic integrity of<br />

the cemetery.<br />

The footprint of the preferred alternative would affect three resources, but the<br />

project is unlikely to adversely affect the historic qualities that make the properties<br />

eligible for the National Register. El Camino de Mañana would be realigned<br />

Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at<br />

<strong>Twin</strong> <strong>Peaks</strong>/Linda Vista<br />

4-74<br />

Project No.: NH-0<strong>10</strong>-D (AIW)<br />

TRACS No.: <strong>10</strong> PM 236 H5838 01D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!