01.03.2013 Views

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Mitigation Measures October 2005<br />

Standard Specifications included as Mitigation Measures:<br />

1. Excess waste material and construction debris would be disposed of at sites<br />

supplied by the contractor in accordance with Arizona Department of<br />

Transportation’s Standard Specifications for Road and Bridge Construction<br />

Section <strong>10</strong>7.11 Protection and Restoration of Property and Landscape (2000<br />

Edition). Disposal would be made at either municipal landfills approved under<br />

Title D of the Resource Conservation and Recovery Act, construction debris<br />

landfills approved under Article 3 of the Arizona Revised Statutes 49-241<br />

(Aquifer Protection Permit) administered by the Arizona Department of<br />

<strong>Environmental</strong> Quality, or inert landfills. (Refer to page 4-12)<br />

2. During construction, the contractor would follow Arizona Department of<br />

Transportation’s Standard Specifications for Road and Bridge Construction,<br />

Section <strong>10</strong>4.09 Prevention of Landscape Defacement; Protection of Streams,<br />

Lakes and Reservoirs (2000 Edition) and the Water Quality Standards in Title 18,<br />

Chapter 11 of the Arizona Administrative Code as administered by the Arizona<br />

Department of <strong>Environmental</strong> Quality. (Refer to page 4-45)<br />

3. During construction, the contractor would control, reduce, remove or prevent air<br />

pollution in all its forms, including air contaminants, in the performance of the<br />

contractor’s work in accordance with Arizona Department of Transportation’s<br />

Standard Specifications for Road and Bridge Construction, Section <strong>10</strong>4.08<br />

Prevention of Air and Noise Pollution (2000 Edition). (Refer to page 4-48)<br />

4. During construction, the contractor would control construction noise in<br />

accordance with Arizona Department of Transportation’s Standard Specifications<br />

for Road and Bridge Construction, Section <strong>10</strong>4.08 Prevention of Air and Noise<br />

Pollution (2000 Edition). (Refer to page 4-57)<br />

5. According to Arizona Department of Transportation’s Standard Specifications for<br />

Road and Bridge Construction, Section <strong>10</strong>7 Legal Relations and Responsibility to<br />

Public (2000 Edition) (Stored Specification <strong>10</strong>7HAZMT, 01/15/93), if previously<br />

unidentified or suspect hazardous materials are encountered during construction,<br />

work would stop at that location and the Town of Marana Engineer would be<br />

contacted to arrange for proper treatment of those materials. Such locations would<br />

be investigated and proper action implemented prior to the continuation of work<br />

in that location. (Refer to Page 4-66)<br />

6. According to Arizona Department of Transportation’s Standard Specifications for<br />

Road and Bridge Construction, Section <strong>10</strong>7.05 Legal Relations and<br />

Responsibility to Public, Archaeological Features (2000 Edition), if previously<br />

unidentified cultural resources are encountered during activity related to the<br />

construction of the project, the contractor would stop work immediately at that<br />

location and would take all reasonable steps to secure the preservation of those<br />

resources and notify the Engineer. The Engineer would contact the Arizona<br />

Department of Transportation <strong>Environmental</strong> Planning Group, Historic<br />

Preservation Team (602.712.8636) immediately and make arrangements for the<br />

proper treatment of those resources. Arizona Department of Transportation<br />

Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at<br />

<strong>Twin</strong> <strong>Peaks</strong>/Linda Vista<br />

xviii<br />

Project No.: NH-0<strong>10</strong>-D (AIW)<br />

TRACS No.: <strong>10</strong> PM 236 H5838 01D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!