01.03.2013 Views

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Public Involvement/Project Coordination October 2005<br />

Comment: Will we be meeting again with Sunflower?<br />

Response: Yes, several meetings with the public would occur during the project. A<br />

public hearing on the EA would occur.<br />

Comment: What will happen at <strong>Twin</strong> <strong>Peaks</strong> Elementary School when traffic increases<br />

on <strong>Twin</strong> <strong>Peaks</strong> Road?<br />

Response: According to the <strong>Traffic</strong> Report, most pedestrian and bicycle traffic to <strong>Twin</strong><br />

<strong>Peaks</strong> Elementary School originates south and east of the school. A shared use path was<br />

proposed south of <strong>Twin</strong> <strong>Peaks</strong> Road, but is not a part of this project (see Chapter 3,<br />

Preferred Alternative, page 3-11). The proposed traffic signals at the intersections of<br />

<strong>Twin</strong> <strong>Peaks</strong> Road/Coachline Boulevard and <strong>Twin</strong> <strong>Peaks</strong> Road/Silverbell Road would<br />

enable pedestrians to safety cross at these intersections. The Town would work closely<br />

with the Marana Unified School District on appropriate crossing measures.<br />

Letters were sent to approximately 93 homeowners closest to the project inviting them to<br />

one-on-one meetings that were held in early September. The team met with residents on<br />

Saturday September 6, 2003 from 9:00 a.m. to 12:00 p.m. and on Wednesday September<br />

<strong>10</strong>, 2004 from 4:00 p.m. to 7:00 p.m. These meetings took place in the small conference<br />

room at the Sunflower Community Center. A total of <strong>10</strong> property owners within<br />

Continental Ranch scheduled individual appointments to meet with members of the<br />

project team to learn about the proposed project, ask any questions, and provide input.<br />

Residents were concerned about the increase in traffic and noise associated with the <strong>Twin</strong><br />

<strong>Peaks</strong> Road TI. The people who lived along the Santa Cruz River were concerned about<br />

visual impacts. Other concerns were the ability to get into and out of the side streets and<br />

safety concerns for the children walking to school.<br />

Public Information Open House #1 - Comments and Response Summary<br />

Approximately 350 people attended an open house on October 20, 2003 at the Sunflower<br />

Village Center – 9401 North Sunflower Park Drive. Blank aerial maps were displayed<br />

and project team members explained the overall project concept to individuals and small<br />

groups. Comment forms were provided asking the participants to record any comments or<br />

ask any questions. Notifications were mailed to approximately 15,000 residents that<br />

reside within a few miles of the project area, including residents in Continental Ranch,<br />

Sunflower, Dove Mountain, and communities east of I-<strong>10</strong>. Newspaper advertisements<br />

were placed in the October 5, 2003, Sunday Arizona Daily Star and the weekly<br />

Northwest Explorer newspapers on October 8, 2003. A summary of comments received<br />

and advertisements for the meeting may be found in Appendix A.<br />

Comment: Construct the TI immediately to relieve Cortaro Road and Silverbell Road (45<br />

comments)<br />

Response: This project would utilize federal funds and must follow the federal process;<br />

therefore, final design may not proceed until after the environmental documentation is<br />

completed.<br />

Comment: Provide grade-separation at the railroad (24 comments)<br />

Response: A grade-separated railroad crossing is part of the proposed improvements<br />

Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at<br />

<strong>Twin</strong> <strong>Peaks</strong>/Linda Vista<br />

5-5<br />

Project No.: NH-0<strong>10</strong>-D (AIW)<br />

TRACS No.: <strong>10</strong> PM 236 H5838 01D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!