01.03.2013 Views

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

I-10 Twin Peaks Traffic Interchange, Environmental Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Affected Environment and <strong>Environmental</strong> Impacts October 2005<br />

of the Santa Catalina Mountains while other minor washes originate in the<br />

Tortolita Mountains located to the northeast of the study area. According to the<br />

Drainage Report, runoff from Tortolita Mountains to the Santa Cruz River is<br />

impeded by the UPRR, the I-<strong>10</strong> westbound frontage road, and the I-<strong>10</strong> mainline.<br />

The UPRR is located on the upstream side of the westbound frontage road, and,<br />

because the existing cross drainage structures are undersized, this causes flow<br />

from the upstream watersheds to pond at the drainage structures. Excess flows not<br />

conveyed by cross drainage structures continue to the northwest along the<br />

upstream side of the UPRR to the next cross drainage structure. This pattern is<br />

consistent throughout the study area, and continues beyond the limits of the study<br />

area.<br />

Additional cross drainage structures are located under the I-<strong>10</strong> frontage roads and<br />

mainline. Generally there is adequate drainage capacity to prevent the 50-year<br />

rainfall event from ponding on the I-<strong>10</strong> frontage roads and mainline because of a<br />

combination of: 1) the metering of flows to the roadways by the UPRR drainage<br />

structures; 2) the capacities of the I-<strong>10</strong> frontage road and I-<strong>10</strong> mainline drainage<br />

structures; and 3) the capacities of the roadside ditches which transmit flows along<br />

the roadways to the northwest. In one area north of the <strong>Twin</strong> <strong>Peaks</strong> Road TI and<br />

one location south of the <strong>Twin</strong> <strong>Peaks</strong> Road TI, however, runoff exceeds the<br />

capacity of this system. In these locations, water can flow over the westbound<br />

frontage road and the I-<strong>10</strong> mainline during a heavy rainfall event.<br />

There are no cross drainage structures along El Camino de Mañana and Linda<br />

Vista Boulevard within the study area and stormwater runoff currently overtops<br />

the surface of these roadways.<br />

Impacts<br />

No Build Alternative<br />

Under the no build alternative, no impacts to surface water resources would result<br />

and no improvements to the drainage facilities near I-<strong>10</strong> would occur; however,<br />

drainage improvements would occur as a part of the ultimate freeway<br />

improvements proposed in the I-<strong>10</strong> General Plan. According to PAG’s 2025<br />

Regional Transportation Plan (as amended), I-<strong>10</strong> is proposed to consist of 8 lanes<br />

by 2025 from the Pinal/Pima County line to the I-<strong>10</strong>/I-19 <strong>Interchange</strong>. However,<br />

these improvements are not programmed (planned and funded) in PAG’s 2005-<br />

2009 Transportation Improvement Program; therefore, it may be assumed that<br />

these improvements would be programmed between the years 20<strong>10</strong> and 2025. As a<br />

result, the potential for a heavy rainfall event to cause water to flow over the<br />

westbound frontage road and the I-<strong>10</strong> mainline in the project area would remain<br />

until these improvements were completed.<br />

Under the no build alternative, stormwater runoff that currently flows over the<br />

surface of El Camino de Mañana and Linda Vista Boulevard would not be routed<br />

under the roadways. As a result, surface flows that may damage the structure of<br />

the roadways and pose a safety challenge to motorists would continue.<br />

Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at<br />

<strong>Twin</strong> <strong>Peaks</strong>/Linda Vista<br />

4-<strong>10</strong><br />

Project No.: NH-0<strong>10</strong>-D (AIW)<br />

TRACS No.: <strong>10</strong> PM 236 H5838 01D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!