Affected Environment and <strong>Environmental</strong> Impacts October 2005<br />

year floodplain with sheet flow flooding where average depths are less than 1 foot;<br />

in the <strong>10</strong>0-year floodplain with stream flooding where the contributing drainage is<br />

less than one square mile; or, protected from <strong>10</strong>0-year flood events by levees. The<br />

FIRMs for the study area are shown in Figure 4-2.<br />

Impacts<br />

No Build Alternative<br />

Under the no build alternative, no affects to floodplains would occur.<br />

Preferred Alternative<br />

Based on the information contained in the FIRMs for the study area, the proposed<br />

improvements constitute actions within the limits of the base floodplain; therefore,<br />

compliance with EO 11988 and 23 CFR 650 must be demonstrated. These actions<br />

within the <strong>10</strong>0-year floodplain include construction of: twin bridges spanning the<br />

low flow channel of the Santa Cruz River; bridge and roadway embankments<br />

within the high flow Santa Cruz River channel; bridge and roadway embankments<br />

on the east side of I-<strong>10</strong>; a new signalized intersection at <strong>Twin</strong> <strong>Peaks</strong> Road/El<br />

Camino de Mañana/Linda Vista Boulevard; and, reconstruction of Linda Vista<br />

Boulevard. The floodplain analysis conducted for these improvements is discussed<br />

in the following paragraphs.<br />

The risks associated with the Santa Cruz River bridges described in Chapter 3,<br />

Alternatives, were analyzed. Based on the scour analysis, the Town of Marana<br />

would design the bridges’ substructures and foundations for these scour depths;<br />

therefore, risks to the structures would be minimized.<br />

Incompatible use or development within the floodplain would not be facilitated by<br />

the proposed project. Any developments within the area must comply with the<br />

Town of Marana or Pima County zoning and floodplain ordinances. The area east<br />

of the proposed improvements is within the Tortolita Basin as defined by Pima<br />

County. The County has designated this area as a critical basin, which requires that<br />

developments provide sufficient stormwater detention to reduce predevelopment<br />

peak flows.<br />

Several improvement alternatives were developed and their associated impacts to<br />

the <strong>10</strong>0-year floodplain were analyzed. Alternatives considered, but eliminated<br />

from further consideration, included: 1) the no build alternative; 2) bridges<br />

spanning the high flow channel of the Santa Cruz River; and, 3) bridges spanning<br />

the low flow channel of the Santa Cruz River. These alternatives were eliminated<br />

because they either did not address the stated purpose and need of the proposed<br />

improvements (no build alternative) or they would increase flood elevations over the<br />

allowable 0.1 foot according to ADOT and Pima County design standards (the two<br />

bridge alternatives).<br />

Interstate <strong>10</strong> <strong>Traffic</strong> <strong>Interchange</strong> at<br />

<strong>Twin</strong> <strong>Peaks</strong>/Linda Vista<br />

4-16<br />

Project No.: NH-0<strong>10</strong>-D (AIW)<br />

TRACS No.: <strong>10</strong> PM 236 H5838 01D